CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2014 — Second Amendment, 2019
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019
Amendment · Gazette copyDated 30 Jan 2019No. L-1/144/2013-CERC.— dated 30th January, 2019
Replaced by Terms and Conditions of Tariff Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Terms and Conditions of Tariff Regulations, 2014 — Second Amendment, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page CERC gazette notification, dated 30 January 2019, amending the CERC (Terms and Conditions of Tariff) Regulations, 2014 (p2). Clause 1 gives the amending regulations their short title and ties commencement to the date of notification in the Official Gazette.
Clause 2 is the whole substance of the amendment: it inserts a new Regulation 49A immediately after Regulation 49 of the 2014 regulations (p2). The inserted text creates a "Transmission Majoration Factor" for transmission projects executed through the JV route, drawing its eligibility condition from Regulation 4.10A of CERC's 2001 Tariff Regulations, and makes the factor available for 25 years running from the date of issue of the transmission licence (p2).
A note at the foot records the gazette publication particulars of the principal 2014 regulations and of the first amendment (p2). No repeal, savings or transitional provision is stated.
Read with this
The regulation
- Dated 21 Feb 2014Terms and Conditions of Tariff Regulations, 2014
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (1)
Earlier drafts
- Dated 25 Jun 2013Terms and Conditions of Tariff from 1.4.2014 — Public Notice
- Dated 24 Jul 2013Terms and Conditions of Tariff for the tariff period from 1.4.2014 — Public Notice extending comment deadline to 14.08.2013
- Dated 6 Dec 2013Draft Terms and Conditions of Tariff Regulations, 2014 (tariff period 1.4.2014 to 31.3.2019) — Public Notice
- Dated 6 Dec 2013Terms and Conditions of Tariff Regulations, 2014 — Draft
- Dated 4 Jun 2015Terms and Conditions of Tariff (First Amendment) Regulations, 2015 — Draft
- Released with the notice dated 4 Jun 2015Explanatory memorandum: Explanatory Memorandum to Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2015
- Dated 4 Jun 2015Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2014
- Dated 28 Apr 2017Terms and Conditions of Tariff (Second Amendment) Regulations, 2017
- Released with the notice dated 28 Apr 2017Explanatory memorandum: Draft Terms and Conditions for Tariff (Second Amendment) Regulations, 2017 — Explanatory Memorandum
- Dated 28 Apr 2017Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2017 — Public Notice
2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.