Terms and Conditions of Tariff Regulations, 2014 — Draft

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014

Draft regulationDated 6 Dec 2013

Draft

A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission issued this draft notification on 6 December 2013 to make the CERC (Terms and Conditions of Tariff) Regulations, 2014, for the five-year tariff period 1 April 2014 to 31 March 2019 (p1). It is a full principal regulation issued for previous publication, with a blank notification number (p1).

Chapters 1–3 set the framework. Chapter 1 gives the short title, commencement and scope, applying the regulations to generating stations and inter-State transmission systems whose tariff CERC determines under sections 62 and 79 of the Electricity Act, while excluding tariff-based competitively bid projects under section 63 and renewable energy stations covered by the 2012 RE tariff regulations (p1–3). It also contains extensive definitions (p3–21). Chapter 2 fixes how commercial operation and trial runs are established for thermal, hydro, transmission and communication assets (p22–27). Chapter 3 prescribes the tariff petition process, consolidated filings, prudence check and truing-up timelines (p28–39).

Chapters 4–6 deal with money. Chapter 4 sets out capital cost computation, prudence check, IDC/IEDC, initial spares, additional capitalisation, renovation and modernisation, special and compensation allowances, infirm power, and debt-equity treatment (p40–61). Chapter 5 defines the two-part tariff for thermal and hydro stations and the transmission charge, plus landed fuel cost (p62–64). Chapter 6 specifies annual fixed cost components: return on equity, tax on ROE, interest on loan, depreciation, working capital interest and O&M expenses, with normative O&M tables (p65–84).

Chapters 7–9 provide the operational mechanics: formulae and incentives for thermal, hydro, pumped storage and transmission charges, and UI treatment (p85–104); norms of operation for thermal, hydro and transmission assets (p105–119); and scheduling, metering, billing, sharing, rebate and late payment surcharge (p120–124). Chapter 10 contains miscellaneous provisions including CDM benefit sharing, ceiling norms, deviation, deferred tax, forex hedging, fee recovery, DVC-specific rules, and powers to relax or remove difficulty (p125–133).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

The regulation

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.