CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2014 — Draft
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014
Draft regulationDated 6 Dec 2013
Draft
A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission issued this draft notification on 6 December 2013 to make the CERC (Terms and Conditions of Tariff) Regulations, 2014, for the five-year tariff period 1 April 2014 to 31 March 2019 (p1). It is a full principal regulation issued for previous publication, with a blank notification number (p1).
Chapters 1–3 set the framework. Chapter 1 gives the short title, commencement and scope, applying the regulations to generating stations and inter-State transmission systems whose tariff CERC determines under sections 62 and 79 of the Electricity Act, while excluding tariff-based competitively bid projects under section 63 and renewable energy stations covered by the 2012 RE tariff regulations (p1–3). It also contains extensive definitions (p3–21). Chapter 2 fixes how commercial operation and trial runs are established for thermal, hydro, transmission and communication assets (p22–27). Chapter 3 prescribes the tariff petition process, consolidated filings, prudence check and truing-up timelines (p28–39).
Chapters 4–6 deal with money. Chapter 4 sets out capital cost computation, prudence check, IDC/IEDC, initial spares, additional capitalisation, renovation and modernisation, special and compensation allowances, infirm power, and debt-equity treatment (p40–61). Chapter 5 defines the two-part tariff for thermal and hydro stations and the transmission charge, plus landed fuel cost (p62–64). Chapter 6 specifies annual fixed cost components: return on equity, tax on ROE, interest on loan, depreciation, working capital interest and O&M expenses, with normative O&M tables (p65–84).
Chapters 7–9 provide the operational mechanics: formulae and incentives for thermal, hydro, pumped storage and transmission charges, and UI treatment (p85–104); norms of operation for thermal, hydro and transmission assets (p105–119); and scheduling, metering, billing, sharing, rebate and late payment surcharge (p120–124). Chapter 10 contains miscellaneous provisions including CDM benefit sharing, ceiling norms, deviation, deferred tax, forex hedging, fee recovery, DVC-specific rules, and powers to relax or remove difficulty (p125–133).
Read with this
The regulation
- Dated 21 Feb 2014Terms and Conditions of Tariff Regulations, 2014
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (2)
Earlier drafts
- Dated 25 Jun 2013Terms and Conditions of Tariff from 1.4.2014 — Public Notice
- Dated 24 Jul 2013Terms and Conditions of Tariff for the tariff period from 1.4.2014 — Public Notice extending comment deadline to 14.08.2013
- Dated 6 Dec 2013Draft Terms and Conditions of Tariff Regulations, 2014 (tariff period 1.4.2014 to 31.3.2019) — Public Notice
- Dated 4 Jun 2015Terms and Conditions of Tariff (First Amendment) Regulations, 2015 — Draft
- Released with the notice dated 4 Jun 2015Explanatory memorandum: Explanatory Memorandum to Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2015
- Dated 4 Jun 2015Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2014
- Dated 28 Apr 2017Terms and Conditions of Tariff (Second Amendment) Regulations, 2017
- Released with the notice dated 28 Apr 2017Explanatory memorandum: Draft Terms and Conditions for Tariff (Second Amendment) Regulations, 2017 — Explanatory Memorandum
- Dated 28 Apr 2017Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2017 — Public Notice
2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.