Statement of Reasons

Statement of reasonsDated 24 Apr 2014No.L-1/144/2013/CERC dated 24.4.2014

Replaced by Terms and Conditions of Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Terms and Conditions of Tariff Regulations, 2014 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 35 of 290. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons (also called the Statement of Objects and Reasons) for the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014, notified on 21 February 2014 for the tariff period 1 April 2014 to 31 March 2019 (p1–3). It is dated 24 April 2014 and carries file number L-1/144/2013/CERC (p1).

Sections 1 and 2 set out the statutory basis (Electricity Act 2003, ss.61, 79(1), 178(2)(s)), the consultation trail — CEA recommendations, a suo motu data order, an Approach Paper, the December 2013 draft Regulations and a public hearing on 15–16 January 2014 — and the SOR's purpose of recording stakeholder submissions with the Commission's reasoning (p1–4). Section 3 gives a statistical picture of the sector: installed capacity, peak and energy deficit trends, five-year capacity addition and falling thermal plant load factor (p4–7).

Section 4 explains the scope of the regulations, retaining the exclusion of projects whose tariff is adopted through competitive bidding under Section 63 (p8–9). Section 5, beginning p9, then works through the Regulation 3 definitions one by one: additional capitalisation, auxiliary energy consumption, auditor, bank rate, beneficiary, block, capital cost, change in law, communication system, competitive bidding, cut-off date, declared capacity, de-capitalisation, de-commissioning, design energy, element, force majeure, generating unit, Indian Governmental Instrumentality, hydro/generating station, installed capacity, implementation agreement, investment approval, long-term transmission customer, original project cost, plant availability factor and plant load factor (p9–35). For each it records stakeholder suggestions, the Commission's analysis and the final drafting decision, including terms newly added or deleted from the draft.

The portion ends mid-discussion of Plant Load Factor at p35. Annex-1 (stakeholders who commented) and Annex-2 (public-hearing participants) are referenced (p3).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

The regulation

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.