Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions for Tariff (Second Amendment) Regulations, 2017 — Statement of Reasons

Central Electricity Regulatory Commission (Terms and Conditions for Tariff) (Second Amendment) Regulations, 2017

Statement of reasonsDated 30 Jan 2019

Replaced by Terms and Conditions of Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Terms and Conditions of Tariff Regulations, 2014 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's Statement of Reasons dated 30.01.2019 explains why the Commission dropped its 2017 proposal to withdraw the Transmission Majoration Factor (TMF) and instead only clarified how long it runs (p1, pp8–10).

Pages 1–2 record the consultation: the draft Second Amendment to the Tariff Regulations was published on 28.4.2017 with an Explanatory Memorandum, comments closed on 19.5.2017, and a public hearing followed on 8.8.2017. Pages 2–3 trace the history of Regulation 4.10A of the 2001 Tariff Regulations, which granted a pre-tax markup on transmission charges to projects built through IPTC/JV routes and licensed under s.27C of the 1910 Act up to 31.3.2004 — Powerlinks being the only such licensee — and the Commission's 2016 direction to staff to review that promotional scheme.

Pages 3–4 set out the proposed new Regulation 49A, which would have withdrawn TMF with immediate effect, and the Explanatory Memorandum's reasons for withdrawal. Pages 4–7 summarise the comments received: Powerlinks against withdrawal (vested right, promissory estoppel, legitimate expectation, dissimilar treatment, small consumer impact); REC against withdrawal for regulatory uncertainty; BRPL and GRIDCO in favour; plus an individual submission in favour.

Pages 8–9 give the Commission's analysis and its decision not to proceed with the amendment, holding that the policy promise made through the regulations should be carried to its logical end. Pages 9–10 clarify that TMF is confined to a period of 25 years from the date of issue of the transmission licence, since the useful life of transmission assets was later raised to 35 years, and quote the provision inserted as Regulation 49A of the 2014 Tariff Regulations.

Standard name
Tariff Regulations
Primary topics
Transmission tariff

Read with this

The regulation

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document