CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff (Second Amendment) Regulations, 2017
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2017
Draft amendmentDated 28 Apr 2017No.-L-1/144/2013-CERC dated 28th April, 2017
Draft
A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2014 — Second Amendment, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A one-page CERC notification dated 28 April 2017 (p1) making the Second Amendment to the CERC (Terms and Conditions of Tariff) Regulations, 2014. Clause 1 gives the short title of the amending instrument and states that it comes into force from the date of notification in the Official Gazette (p1). Clause 2 is the operative provision: it inserts a new Regulation 49A into the Principal Regulations (p1).
Regulation 49A, headed "Transmission Majoration Factor", withdraws with immediate effect the Transmission Majoration Factor that was allowed to transmission projects executed through the joint-venture route under Regulation 4.10A of the CERC (Terms and Conditions of Tariff) Regulations, 2001 (p1). A closing note records the gazette publication particulars of the Principal Regulations (12 March 2014) and of the first amendment (24 November 2015) (p1).
The instrument is a targeted withdrawal of a legacy incentive rather than a general revision of the tariff framework; it does not restate the 2014 Regulations and says nothing about treatment of projects already availing the factor.
Read with this
The regulation
- Dated 21 Feb 2014Terms and Conditions of Tariff Regulations, 2014
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (2)
Earlier drafts
- Dated 25 Jun 2013Terms and Conditions of Tariff from 1.4.2014 — Public Notice
- Dated 24 Jul 2013Terms and Conditions of Tariff for the tariff period from 1.4.2014 — Public Notice extending comment deadline to 14.08.2013
- Dated 6 Dec 2013Draft Terms and Conditions of Tariff Regulations, 2014 (tariff period 1.4.2014 to 31.3.2019) — Public Notice
- Dated 6 Dec 2013Terms and Conditions of Tariff Regulations, 2014 — Draft
- Dated 4 Jun 2015Terms and Conditions of Tariff (First Amendment) Regulations, 2015 — Draft
- Released with the notice dated 4 Jun 2015Explanatory memorandum: Explanatory Memorandum to Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2015
- Dated 4 Jun 2015Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2014
- Released with the notice dated 28 Apr 2017Explanatory memorandum: Draft Terms and Conditions for Tariff (Second Amendment) Regulations, 2017 — Explanatory Memorandum
- Dated 28 Apr 2017Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2017 — Public Notice
2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.