Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff (Second Amendment) Regulations, 2017

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2017

Draft amendmentDated 28 Apr 2017No.-L-1/144/2013-CERC dated 28th April, 2017

Draft

A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2014 — Second Amendment, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page CERC notification dated 28 April 2017 (p1) making the Second Amendment to the CERC (Terms and Conditions of Tariff) Regulations, 2014. Clause 1 gives the short title of the amending instrument and states that it comes into force from the date of notification in the Official Gazette (p1). Clause 2 is the operative provision: it inserts a new Regulation 49A into the Principal Regulations (p1).

Regulation 49A, headed "Transmission Majoration Factor", withdraws with immediate effect the Transmission Majoration Factor that was allowed to transmission projects executed through the joint-venture route under Regulation 4.10A of the CERC (Terms and Conditions of Tariff) Regulations, 2001 (p1). A closing note records the gazette publication particulars of the Principal Regulations (12 March 2014) and of the first amendment (24 November 2015) (p1).

The instrument is a targeted withdrawal of a legacy incentive rather than a general revision of the tariff framework; it does not restate the 2014 Regulations and says nothing about treatment of projects already availing the factor.

Standard name
Tariff Regulations
Primary topics
Transmission tariff

Read with this

The regulation

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document