Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Tariff Regulations 2005 — Draft Amendment, 2013

Draft Amendment to the Terms and Conditions for determination of Tariff Regulations 2005

Draft amendmentDated 8 Nov 2013TNERC / TR /5/2/10 dated 08-11- 2013

Draft

A proposal that has since been finalised as the Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission consultation document: a draft amendment, notified on 8 November 2013, to the TNERC (Terms and Conditions for determination of Tariff) Regulations 2005. The notice publishes the proposed text for objections under section 181(3) of the Electricity Act 2003 and says the Commission will take the amendments into consideration on or after 15 days from publication on the TNERC website; objections go to the Secretary (p1). It is a draft, not a completed amendment.

Clauses (a)–(g) touch the front part of the principal regulations. They narrow the application of the 2005 Regulations to co-generation, captive plants and renewable generation, including mini hydro, to the extent the Commission specifies in tariff or other orders (p1); replace regulation 12 with a power-factor provision authorising directions to consumer categories and a disincentive (p1–2); substitute “The Licensees” for the Tamil Nadu Electricity Board in regulation 15(2) (p2); require a five-year business plan six months before the MYT petition, covering loss reduction, tamper-proof metering and projection criteria (p2); set an infirm-power pricing formula and an allocation key among distribution licensees based on approved total sales (p2); omit regulation 24-A (p2); and change the percentage in regulation 25(2)–(8) from 4% to 5.72% (p2).

The remaining clauses revise transmission and miscellaneous provisions and the depreciation annexure. Regulation 62 is recast to require substation-wise transmission ARR filing and a separate SLDC ARR petition, removes the data-availability condition, and describes the network-use charge as recovering the transmission entity’s annual revenue requirement for owning the transmission asset (p3). Regulation 71(2) adopts “The Licensees” (p3), regulation 83 is omitted (p3), and the Annexure is replaced by an asset-wise depreciation schedule referring to regulation 24, with rates for land, generating plant, buildings, transformers, switchgear, cables, meters, vehicles, office equipment and IT assets (p3–5).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), Transmission tariff

Read with this

Consolidated copies, for reference (2)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document