Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Terms and Conditions for Determination of Tariff Regulations, 2005

Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for the determination of Tariff) Regulations, 2005.

RegulationDated 24 Jun 2005Published in the Gazette 3 Aug 2005Notification No. TNERC/TR/5/2 dated 24.06.2005

10 amendments to it are on Voltaic, the latest dated 1 Jul 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 42 of 60. Check the regulator's original before you rely on it.

The document is the Tamil Nadu Electricity Regulatory Commission's 2005 principal tariff regulation, issued under s.61 read with s.181 of the Electricity Act 2003 and published in the Tamil Nadu Government Gazette dated 3 August 2005 (p1–2). It replaces the 2002 Tariff Regulations and applies to tariff determination under s.62 across Tamil Nadu, but expressly excludes co-generation, captive plants and renewable generation including mini-hydro, which are to be covered by a separate s.86(1)(e) regulation (p2).

Chapters I–II set the definitions and the procedural framework: who may apply, annual ARR filing, application formats and fees, public participation, the Commission's tariff order timeline, publication and communication, refunds, time-of-day tariff, power factor, regulatory asset and multi-year tariff (pp2–18). Chapter III lays down cost and return principles — capital cost, additional capitalisation, debt-equity, return on equity, interest, depreciation, O&M, working capital, interest on working capital, bad debts, insurance, contingency reserve, foreign exchange variation and income tax — for generating stations and licensees (pp19–29).

Chapter IV specifies thermal tariff design and operating norms (pp30–37), Chapter V hydro tariff design and norms (pp38–41), and Chapter VI begins the transmission tariff framework (p42).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

Consolidated copies, for reference (2)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TNERC's website on 29 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document