Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Terms and Conditions for Determination of Tariff Regulations 2005 — Amendment, 2021

Amendment to the Terms and Conditions for Determination of Tariff Regulations 2005

AmendmentDated 26 May 2021TNE RC/TR/5/3 dated 26-05-2021

Amends the Terms and Conditions for Determination of Tariff Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is TNERC's amendment to its 2005 Tariff Regulations, notified as Notification No. TNERC/TR/5/3 dated 26 May 2021, with the order authenticated at Chennai on 28 May 2021 (p1, p3, p7). It comes into force on the date of publication in the Tamil Nadu Government Gazette; that Gazette date is not printed in the text (p1).

The amendment makes six changes. It rewrites the definition of Operation and Maintenance Expenses in regulation 2(1)(bb) so that it expressly covers consumables, overheads and fuel not used for generating electricity (p1). It adds a proviso to regulation 24(vii) on depreciation, treating the salvage value of IT equipment and software as nil so the whole asset value is depreciable (p1). It inserts a new regulation 29 permitting a provision for bad and doubtful debts, with true-up in the ARR and subsequent recoveries credited as non-tariff income (p1).

The largest change is the new regulation 37(vii) (p1–2): where the SLDC directs a generating station to run below target plant availability factor but at or above technical minimum, the station may be compensated, with station heat rate and auxiliary energy consumption degradation allowed by unit-loading bands, compensation recovered through energy charges, and liability placed on the entity that caused the under-scheduling. Reconcilitation happens at the end of the financial year, and nothing is payable where actual heat rate or auxiliary consumption is below normative.

Regulation 68 gains wheeling/network charges as a tariff component, determinable on the distribution licensee's application or suo motu, separately for LT and HT consumers and in whatever denomination the Commission stipulates (p1, p3). Regulation 70 now requires accounting segregation of the wires and retail supply businesses, with an allocation matrix to apportion ARR where segregation is incomplete (p2–3). The Explanatory Statement (p3) links these changes to CERC Tariff Regulations and to norms adopted by other state commissions, and states the wheeling charge is meant to recover distribution network cost. Pages 4–7 repeat the amendments in comparative form.

Standard name
Tariff Regulations
Primary topics
Wheeling and retail supply tariff, Tariff determination, Scheduling and despatch

Read with this

Consolidated copies, for reference (2)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document