Terms and Conditions for Determination of Tariff Regulations, 2005 — Republished as amended upto 31-12-2009

Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for the determination of Tariff) Regulations, 2005.

Consolidated copyDated 31 Dec 2009TNERC/TR/5/2-7 dated 20/01/2010

A consolidated copy of the Terms and Conditions for Determination of Tariff Regulations, 2005, published by TNERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 42 of 66. Check the regulator's original before you rely on it.

The text is TNERC's consolidated republication of the 2005 Tariff Regulations as amended up to 31-12-2009, issued by Notification No. TNERC/TR/5/2-7 dated 20/01/2010 (p1). Pages 1–2 explain that the Commission is republishing the principal 2005 regulations together with six amendment/errata notifications in the Gazette so the public has an up-to-date text; it is made under Electricity Act 2003 s.61 read with s.181 (p2) and supersedes TNERC Tariff Regulations 2002 (p3).

Chapter I (pp3–9) gives the short title, applicability and commencement, and definitions. It extends to the whole of Tamil Nadu and applies to tariff determination under s.62, but excludes co-generation, captive generating plants and renewable/mini-hydro generation, which are to be covered by a separate regulation under s.86(1)(e) (p3).

Chapter II (pp9–20) sets the tariff-setting architecture: s.62 cases such as generation supply to distribution licensees, intra-State transmission, wheeling and retail supply; s.64(5) interstate cases; and s.63 adoption of bid-determined tariffs (pp9–11). It lists tariff principles (Section 61 guidelines, cost-reflective tariffs, cross-subsidy reduction, consumer affordability, payment security and PPA alignment) (pp11–13). It prescribes annual ARR filing, applications, fees, formats, separate accounts, two-stage provisional/final tariff, public consultation, a 120-day order timeline, publication, communication and refund (pp13–17). It also provides for time-of-day tariff, power factor incentives/disincentives, regulatory asset, multi-year tariff, annual accounts, business plan and capital investment plan (pp17–20).

Chapter III (pp21–35) lays out cost and return computation: capital cost and prudence check, initial spares ceilings, additional capitalisation, trial-stage revenue, debt-equity ratio, return on equity, interest/finance charges, depreciation, advance against depreciation, O&M expenses, working capital, interest on working capital, deviations from norms, bad debts, insurance, contingency reserve, forex variation, income tax and provisional true-up.

Chapter IV (pp35–42) covers thermal generating stations: application, two-part tariff, norms of operation (target availability, target PLF, station heat rate, secondary fuel oil, auxiliary consumption, stabilisation period), treatment of infirm power, SLDC/transmission charges, other income, capacity charge computation/recovery, energy charges and fuel price adjustment, incentive, and UI charges.

Standard name
Tariff Regulations
Primary topics
Tariff determination, ARR and true-up, Generation tariff

Read with this

Consolidated copies, for reference (1)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document