TNERC · Tamil Nadu Electricity Regulatory Commission

Terms and Conditions for Determination of Tariff Regulations, 2005 — Consolidated as amended up to 31-12-2010

Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for the determination of Tariff) Regulations, 2005

Consolidated copyDated 31 Dec 2010Published in the Gazette 13 Apr 2011TNERC/TR/5/2-9 dated 18-03-2011

A consolidated copy of the Terms and Conditions for Determination of Tariff Regulations, 2005, published by TNERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 21 of 34. Check the regulator's original before you rely on it.

This is the Tamil Nadu Electricity Regulatory Commission's consolidated re-publication of the TNERC (Terms and Conditions for Determination of Tariff) Regulations, 2005, as amended up to 31-12-2010, issued by notification dated 18-03-2011 and gazetted on 13-04-2011 (p1–2). The preamble lists the original 2005 regulation and subsequent amendments, errata and earlier consolidation, and explains that the Commission is re-publishing them with amendments incorporated so the public can read an up-to-date version (p2). It states that the 2005 regulations supersede the 2002 tariff regulations and extend to the whole of Tamil Nadu, applying to tariff determination under Section 62 (p3).

Chapter I (pp3–6) sets commencement, territorial applicability and exclusions, and defines technical and commercial terms used throughout. Chapter II (pp6–11) contains the tariff-determination machinery: the Commission's Section 62 jurisdiction, adoption of Section 63 bid tariffs, tariff-setting principles, annual ARR and tariff application procedure, provisional and final tariff for new projects, tariff order timeline and publication, refund of excess charges, time-of-day tariff, power-factor incentives, regulatory asset treatment, multi-year tariff framework, annual accounts, business plan and capital investment plan.

Chapter III (pp11–17) sets the general principles for computing cost and return: capital cost and additional capitalisation, debt-equity treatment, return on equity, interest and finance charges, depreciation and advance against depreciation, operation and maintenance expenses, working capital and interest on it, deviation from norms, bad and doubtful debts, insurance, contingency reserve, foreign exchange variation and income tax.

Chapter IV (pp17–21) deals with thermal generating stations: application, tariff components, operating norms including availability, plant load factor, station heat rate, secondary fuel oil consumption, auxiliary energy consumption and stabilization period, capital cost and infirm power, SLDC/transmission charges, other income, recovery of capacity charges and energy/variable charge formulas including fuel price adjustment. Later chapters and annexures are not available.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, ARR and true-up

Read with this

Consolidated copies, for reference (1)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗