Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013

Amendment to the Terms and Conditions for determination of Tariff Regulations

AmendmentDated 26 Nov 2013Published in the Gazette 18 Dec 2013TNERC/TR/5/2-10 dated 26-11-2013

Amends the Terms and Conditions for Determination of Tariff Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Government Gazette issue (Part VI—Section 2, No. 49, 18 December 2013) carrying three separate TNERC amendment notifications, each preceded by an explanatory statement and followed by a table comparing the existing and amended text (p1–6). The contents page also lists an unrelated Government Examinations item on loss of certificates (pp614–615), which is not reproduced here (p1).

First, an amendment to the TNERC (Terms and Conditions for determination of Tariff) Regulations 2005, notified 26-11-2013, inserts a new sub-regulation into regulation 7 requiring an applicant that files any document or proposal of its own after filing its tariff petition — other than replies to the Commission's prudence-check queries — to do so by interim application in the main application and to have it hosted on the Commission's website (p2). The explanatory statement records that the Appellate Tribunal for Electricity suggested this change so that licensee submissions made while a tariff petition is being processed are public (p2). A comparison table accompanies it (pp2–3).

The second and third notifications, both dated 25-11-2013, insert identical text into the Tamil Nadu Electricity Distribution Code (regulation 26) and the Tamil Nadu Electricity Supply Code (regulation 3) respectively (pp3, 5–6). Both allow the Chief Executive Officer of the Distribution Licensee, notwithstanding the general category-of-supply rule, to permit supply or additional load at 11/22 kV in a specified area where no 33 kV network exists and building one would be very costly, subject to technical feasibility; such cases must be recorded and reported to the Commission, and the supply must be converted to 33 kV once that network exists (pp3, 6). The explanatory statements justify this as avoiding heavy network expenditure for TANGEDCO while meeting consumer demand (pp4, 6).

Standard name
Tariff Regulations, Distribution Code, Electricity Supply Code
Primary topics
Tariff determination, Conditions of supply, New connections and load changes

Read with this

Read with this: Terms and Conditions for Determination of Tariff Regulations, 2005

Consolidated copies, for reference (2)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

It is also read with: Tamil Nadu Electricity Supply Code (TNESC)

Amends the Tamil Nadu Electricity Supply Code (TNESC).

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

It is also read with: Tamil Nadu Electricity Distribution Code

Amends the Tamil Nadu Electricity Distribution Code.

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document