TNERC · Tamil Nadu Electricity Regulatory Commission
Terms and Conditions for Determination of Tariff Regulations, 2005 — Amendment, 2020
Amendment to the Terms and Conditions for dctermination of Tarifi Regulations 2005
AmendmentDated 18 Sep 2020Published in the Gazette 16 Dec 2020No. Vl(2)/s9/2020 dated 18th September 2020
Amends the Terms and Conditions for Determination of Tariff Regulations, 2005.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a TNERC notification published in the Tamil Nadu Government Gazette of 16 December 2020 (p1) and dated 18 September 2020 (p2, p4). It amends the TNERC (Terms and Conditions for Determination of Tariff) Regulations, 2005 in two places: it adds a head of capital cost recognising expenditure on biomass handling equipment and facilities for co-firing (regulation 18), and adds a norm for working out the landed cost of biomass fuel and the energy charge rate of blended coal-biomass fuel (regulation 37) (p2; restated in the existing/amended comparison at pp4-6).
Most of the notification is an annexed methodology, to be followed by Inter-State Generating Stations and Regional Power Committees, for estimating the electricity generated from biomass in coal-based thermal plants that co-fire biomass, including captive and co-generation plants (pp2-3). It gives a generator-terminal formula attributing electrical energy to biomass from monthly biomass and coal heat inputs, each built from opening stock, receipts and closing stock at weighted-average GCV, and then an ex-bus formula that scales the biomass share by station auxiliary consumption (pp2-3).
Generating companies must keep separate coal and biomass fuel and GCV accounts, publish them with purchase bills, make them available to beneficiaries and RLDC/SLDC, and allow beneficiary representatives to witness GCV testing and inspect during co-firing (p3).
The explanatory statement (pp3-4) sets out the drivers: the Ministry of Power's co-firing policy, MNRE's position that co-fired energy is renewable energy eligible for non-solar RPO, CERC's suo motu order specifying the methodology, and its recognition in the CERC Tariff Regulations 2019. Pages 7-11 repeat the notification in Tamil.
Read with this
The regulation
- Dated 24 Jun 2005Terms and Conditions for Determination of Tariff Regulations, 2005
Amendments and corrections
- Dated 9 May 2006Terms and Conditions for Determination of Tariff (Amendment) Regulations 2006 — Hydro Balancing Fund
- Dated 8 Sep 2007Terms and Conditions for Determination of Tariff, 2005 — Third Amendment, 2007
- Dated 18 Dec 2007Terms and Conditions for Determination of Tariff Regulations, 2005 — Fourth Amendment, 2007
- Dated 26 Nov 2013Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013
- Dated 13 Mar 2014Terms and Conditions for Determination of Tariff Regulations, 2005 — 2014 Amendment
- Dated 10 Feb 2021Terms and Conditions for Determination of Tariff Regulations, 2005 — SLDC ARR Filing Amendment, 2021
- Dated 26 May 2021Terms and Conditions for Determination of Tariff Regulations 2005 — Amendment, 2021
- Dated 5 Sep 2022Terms and Conditions for Determination of Tariff Regulations, 2005 — Amendment, 2022
- Dated 1 Jul 2025Terms and Conditions for Determination of Tariff Regulations, 2005 — Amendment Regulations, 2025
Consolidated copies, for reference (2)
Earlier drafts
- Dated 3 Oct 2013Tamil Nadu Electricity Consumer Grievance Redressal Forum and Electricity Ombudsman Regulations, 2004 — Amendment, 2013 — Draft
- Dated 8 Nov 2013Tamil Nadu Tariff Regulations 2005 — Draft Amendment, 2013
- Dated 5 Mar 2020Terms and Conditions for determination of Tariff Regulations, 2005 — Draft Amendment
- Dated 31 Jul 2020Terms and Conditions for determination of Tariff Regulations, 2005 — Draft Amendment, 2020
- Dated 19 Mar 2021Draft Amendments to the Terms and Conditions for Determination of Tariff Regulations, 2005 — March 2021
- Dated 26 Jul 2022Terms and Conditions for Determination of Tariff Regulations, 2005 — Amendment, 2022 — Draft
- Dated 26 Jun 2024Terms and Conditions for Determination of Tariff Amendment Regulations, 2024 — Draft
13 more documents belong here and are not on Voltaic: 13 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.