Terms and Conditions for Determination of Tariff Regulations, 2005 — Amendment, 2020

Amendment to the Terms and Conditions for dctermination of Tarifi Regulations 2005

AmendmentDated 18 Sep 2020Published in the Gazette 16 Dec 2020No. Vl(2)/s9/2020 dated 18th September 2020

Amends the Terms and Conditions for Determination of Tariff Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC notification published in the Tamil Nadu Government Gazette of 16 December 2020 (p1) and dated 18 September 2020 (p2, p4). It amends the TNERC (Terms and Conditions for Determination of Tariff) Regulations, 2005 in two places: it adds a head of capital cost recognising expenditure on biomass handling equipment and facilities for co-firing (regulation 18), and adds a norm for working out the landed cost of biomass fuel and the energy charge rate of blended coal-biomass fuel (regulation 37) (p2; restated in the existing/amended comparison at pp4-6).

Most of the notification is an annexed methodology, to be followed by Inter-State Generating Stations and Regional Power Committees, for estimating the electricity generated from biomass in coal-based thermal plants that co-fire biomass, including captive and co-generation plants (pp2-3). It gives a generator-terminal formula attributing electrical energy to biomass from monthly biomass and coal heat inputs, each built from opening stock, receipts and closing stock at weighted-average GCV, and then an ex-bus formula that scales the biomass share by station auxiliary consumption (pp2-3).

Generating companies must keep separate coal and biomass fuel and GCV accounts, publish them with purchase bills, make them available to beneficiaries and RLDC/SLDC, and allow beneficiary representatives to witness GCV testing and inspect during co-firing (p3).

The explanatory statement (pp3-4) sets out the drivers: the Ministry of Power's co-firing policy, MNRE's position that co-fired energy is renewable energy eligible for non-solar RPO, CERC's suo motu order specifying the methodology, and its recognition in the CERC Tariff Regulations 2019. Pages 7-11 repeat the notification in Tamil.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Capital cost and investment

Read with this

Consolidated copies, for reference (2)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document