Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Terms and Conditions for Determination of Tariff Regulations, 2005 — 2014 Amendment

Amendment to the Terms and Conditions for determination of Tariff Regulations 2005

AmendmentDated 13 Mar 2014TNERC / TR /5/2-11 dated 13 -03-2014

Amends the Terms and Conditions for Determination of Tariff Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC notification amending its 2005 Terms and Conditions for determination of Tariff Regulations. It was issued on 13 March 2014 under section 61 read with section 181 of the Electricity Act 2003, and comes into force on the date of publication in the Tamil Nadu Government Gazette — the Gazette date itself is not printed (p2).

The operative text (pp2–4) rewrites several regulations. Regulation 1(6) is replaced so that co-generation, captive plants and renewable generation including mini hydro are covered only to the extent the Commission specifies in tariff or other orders (p2). Regulation 12 on power factor is narrowed to a disincentive power only (p2). Regulation 15(2) replaces "The Tamil Nadu Electricity Board" with "The Licensees" (p3). Regulation 16 imposes a new business-plan obligation tied to the MYT petition, with evacuation-improvement projections (p3). Regulation 20(3) replaces the infirm-power cost rule with a formula and an inter-distribution-licensee allotment rule (p3). Regulation 24-A on advance against depreciation and regulation 83 on profit sharing are omitted, and the 4% O&M escalation rate in regulation 25 is substituted (p3). Regulation 62 on unbundling transmission charges is recast, including substation-wise reporting and a separate SLDC ARR petition (p4). Finally the Annexure depreciation schedule (see regulation 24) is substituted wholesale (pp5–6).

The tail of the document is a Secretary's note giving the reasons — removing inconsistencies with other TNERC regulations, reflecting the changed licensee structure in the State, and aligning with CERC tariff regulations (p7) — followed by a side-by-side table of existing and amended provisions running to page 14.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), Transmission tariff

Read with this

Consolidated copies, for reference (2)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document