Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Terms and Conditions for Determination of Tariff Regulations, 2005 — Fourth Amendment, 2007

Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) (Fourth Amendment) Regulations 2007

AmendmentDated 18 Dec 2007TNERC/TR/5/2-4 dated 18.12. 2007

Amends the Terms and Conditions for Determination of Tariff Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment to the TNERC (Terms and Conditions for Determination of Tariff) Regulations 2005, issued by the Tamil Nadu Electricity Regulatory Commission as notification TNERC/TR/5/2-4 dated 18.12.2007 (p1). The Commission states it is amending the principal regulations to take account of the amendments made to the Electricity Act 2003 by the Electricity (Amendment) Act, 2007 (p1).

The amendment makes two substitutions. Clause 2 replaces clause (g) of regulation 4 so that the tariff principles require tariff to progressively reflect the cost of supply and to reduce cross subsidy in the manner the Commission specifies (p2). Clause 3 replaces sub-regulation (3) of regulation 85, providing that the Commission may endeavour to reduce cross subsidy progressively in accordance with a road map it will notify (p2).

The regulations come into force on the date of publication in the Tamil Nadu Government Gazette; that Gazette date is not printed, though the notification itself is dated 18.12.2007 (p1). Both substituted provisions are directional — the operative detail is left to future Commission specification and to a road map to be notified.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Subsidy and cross-subsidy, Cost of supply and cost allocation

Read with this

Consolidated copies, for reference (2)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document