Tamil Nadu Electricity Regulatory Commission (Terms and conditions for determination of Tariff) (Amendment) Regulations, 2025

AmendmentDated 1 Jul 2025Published in the Gazette 30 Jul 2025TNERC/TR/5-5/2025 dated 01-07-2025

Amends the Terms and Conditions for Determination of Tariff Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This gazette part contains two TNERC notifications. The main item (pp2-7) amends the TNERC (Terms and Conditions for determination of Tariff) Regulations, 2005. It is made under s.61 read with s.181 of the Electricity Act 2003 and comes into force on gazette publication (p2). The amendment renumbers the existing Regulation 37(vii) as (viii) and substitutes a new clause (viii) on the impact of part load operation on thermal generating stations (p2). It creates a compensation route where SLDC directs a station below target plant availability but at or above technical minimum, with compensation based on average unit loading and operating parameters verified by SLDC (p2). The substituted clause then sets load-band tables for coal/lignite stations: unit heat rate degradation for sub-critical and super-critical units, admissible additional auxiliary energy consumption, and additional specific fuel oil consumption for units in the lower load range (pp2-3). A proviso allows generators to petition for revised auxiliary consumption parameters after DeSOx/DeNOx installation (p3). For gas/liquid fuel stations, it sets heat-rate degradation tables for combined-cycle and open-cycle operation and additional auxiliary energy consumption by load band (p3). A new Regulation 37(ix) specifies transit and handling loss norms for coal/lignite by pit-head, non-pit-head all-rail, and multi-modal routes, with a pro-rata formula and a rule for imported coal (p4). The Explanatory Statement (p4) grounds the amendment in RE integration, CEA's suggested relaxed parameters, and TANGEDCO true-up claims. Pages 5-7 reproduce existing and amended provisions in comparison tables. Pages 8-9 contain a separate notification under s.87 nominating a State Advisory Committee member for Labour for three years and revising SAC designations for Distribution Licensee and New and Renewable Sources of Energy following the TANGEDCO/TEDA restructuring.

Standard name
Tariff Regulations, State Advisory Committee
Primary topics
Generation tariff, Tariff determination, Emission control costs

Read with this

Consolidated copies, for reference (2)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document