TNERC · Tamil Nadu Electricity Regulatory Commission
Terms and Conditions for determination of Tariff Regulations, 2005 — Draft Amendment, 2020
Draft of amendment to the Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) Regulations, 2005
Draft amendmentDated 31 Jul 2020TNERC/TR/5/2 dated 31-07-2020
Draft
A proposal that has since been finalised as the Terms and Conditions for Determination of Tariff Regulations, 2005 — Amendment, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission published, on 31 July 2020, a draft amendment to its 2005 Terms and Conditions for determination of Tariff Regulations, inviting objections and suggestions to the Secretary by 2 September 2020 and stating that the draft will be taken up after thirty days from publication on the TNERC website (p1).
Two insertions carry the substantive change. A new clause (9) in Regulation 18 brings capital expenditure on biomass handling equipment and facilities for co-firing into the cost base. A new clause (vii) in Regulation 37 governs how the landed cost of biomass blended with coal is worked out — delivered cost at the unloading point including taxes and duties — and how the energy charge rate for the blended fuel is derived, taking biomass consumption as the blending ratio specified by the Authority or actual consumption, whichever is lower (p2).
The remainder of the draft adopts a methodology for measuring how much electricity a coal-based thermal station, including captive and co-generation plants, actually generates from biomass. Step 1 computes biomass energy at the generator terminal by taking biomass's share of total monthly heat input, with each fuel's heat input built from opening stock, receipts during the month and closing stock at weighted-average GCV (pp3–4). Step 2 converts that to ex-bus energy by removing the station's auxiliary consumption in proportion to generation (pp4–5).
Generating companies must maintain separate coal and biomass fuel and GCV accounts, publish signed monthly statements with purchase bills on their websites, make them available to beneficiaries' representatives and RLDC/SLDC on demand, allow witnesses at GCV testing and inspections while co-firing, and publish the biomass fired and the energy attributed to it (pp5–6).
An explanatory statement grounds the draft in the Ministry of Power's co-firing policy (5–10% biomass blend), MNRE's position that co-fired power is renewable energy eligible for non-solar RPO, CERC's suo motu methodology order and its recognition of biomass in the CERC Tariff Regulations, 2019, and NTPC's 10% trial on a 210 MW Dadri unit (pp7–8). A comparative statement of existing and proposed provisions closes the document (pp9–15).
Read with this
The regulation
- Dated 24 Jun 2005Terms and Conditions for Determination of Tariff Regulations, 2005
Amendments and corrections
- Dated 9 May 2006Terms and Conditions for Determination of Tariff (Amendment) Regulations 2006 — Hydro Balancing Fund
- Dated 8 Sep 2007Terms and Conditions for Determination of Tariff, 2005 — Third Amendment, 2007
- Dated 18 Dec 2007Terms and Conditions for Determination of Tariff Regulations, 2005 — Fourth Amendment, 2007
- Dated 26 Nov 2013Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013
- Dated 13 Mar 2014Terms and Conditions for Determination of Tariff Regulations, 2005 — 2014 Amendment
- Dated 18 Sep 2020Terms and Conditions for Determination of Tariff Regulations, 2005 — Amendment, 2020
- Dated 10 Feb 2021Terms and Conditions for Determination of Tariff Regulations, 2005 — SLDC ARR Filing Amendment, 2021
- Dated 26 May 2021Terms and Conditions for Determination of Tariff Regulations 2005 — Amendment, 2021
- Dated 5 Sep 2022Terms and Conditions for Determination of Tariff Regulations, 2005 — Amendment, 2022
- Dated 1 Jul 2025Terms and Conditions for Determination of Tariff Regulations, 2005 — Amendment Regulations, 2025
Consolidated copies, for reference (2)
Earlier drafts
- Dated 3 Oct 2013Tamil Nadu Electricity Consumer Grievance Redressal Forum and Electricity Ombudsman Regulations, 2004 — Amendment, 2013 — Draft
- Dated 8 Nov 2013Tamil Nadu Tariff Regulations 2005 — Draft Amendment, 2013
- Dated 5 Mar 2020Terms and Conditions for determination of Tariff Regulations, 2005 — Draft Amendment
- Dated 19 Mar 2021Draft Amendments to the Terms and Conditions for Determination of Tariff Regulations, 2005 — March 2021
- Dated 26 Jul 2022Terms and Conditions for Determination of Tariff Regulations, 2005 — Amendment, 2022 — Draft
- Dated 26 Jun 2024Terms and Conditions for Determination of Tariff Amendment Regulations, 2024 — Draft
13 more documents belong here and are not on Voltaic: 13 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.