Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Terms and Conditions for Determination of Tariff Regulations, 2005 — SLDC ARR Filing Amendment, 2021

Amendment to the Terms and Conditions for determination of Tariff Regulations, 2005

AmendmentDated 10 Feb 2021Published in the Gazette 31 Mar 2021TNERC/TR/5/2-13 dated 10-02-2021

Amends the Terms and Conditions for Determination of Tariff Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-clause amendment by the Tamil Nadu Electricity Regulatory Commission to its 2005 Terms and Conditions for Determination of Tariff Regulations, published in the Tamil Nadu Government Gazette of 31 March 2021 (p1–2). It inserts a new sub-regulation (1A) into regulation 5, requiring the State Load Despatch Centre to file its Aggregate Revenue Requirement together with its petition for determination of SLDC charges on or before 30 November each year (p2–3). The amendment takes effect from the date of Gazette publication (p2).

The accompanying explanatory statement says the SLDC keeps a separate account and files a separate ARR and tariff petition, and that because it is a separate entity a filing date needs to be fixed for it, as is already done for TANGEDCO and TANTRANSCO (p2). A comparative statement reproduces regulation 5 as existing and as amended.

The document is short and self-contained: no other regulation is touched and nothing else in the 2005 Regulations is altered.

Standard name
Tariff Regulations
Primary topics
SLDC and RLDC fees and charges, ARR and true-up

Read with this

Consolidated copies, for reference (2)

13 more documents belong here and are not on Voltaic: 13 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document