Intra-State Open Access Regulations, 2011 — 12th Amendment, 2025

Punjab State Electricity Regulatory Commission (Terms and Conditions for intra-State Open Access) (12th Amendment) Regulations, 2025

AmendmentDated 14 Jul 2025Published in the Gazette 15 Jul 2025PSERC/Secy/Regu.195 dated The 14th July, 2025

Amends the Terms and Conditions for Intra-state Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the twelfth amendment to PSERC's 2011 intra-state open access regulations, issued as notification PSERC/Secy/Regu.195 dated 14 July 2025 and published in the Punjab Government Gazette (Extraordinary) of 15 July 2025 (p1). It takes effect from gazette notification rather than from a fixed date (p1).

The substance is four changes to the Principal Regulations. A new clause 23(2)(f) creates a transmission deviation charge where an open access customer uses intra-state open access capacity beyond the sum of its allowed long-term, medium-term and short-term access, with separate treatment for LTA/MTOA customers that also take STOA and for partial and full open access customers holding standby agreements with a distribution licensee (p1). A new clause 25(9) puts an equivalent wheeling deviation charge on full open access customers connected to the distribution system (p2). The Note to Regulation 25 is partially substituted to restate how transmission and wheeling charges apply to power from NRSE projects — including who bears deviation charges, a revenue pass-through to the STU/transmission licensee where 132 kV and above is involved, and full charges for NRSE power generated outside the state (p2). Finally, the first proviso to Regulation 28(6)(i) is substituted so that drawal of banked energy is barred during peak seasonal periods and peak load hours as approved by the Commission in each year's tariff order (p2). Page 3 lists the Principal Regulations and its first eleven amendments; nothing in the text purports to repeal anything.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Energy banking

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document