Intra-State Open Access Regulations, 2011 — 8th Amendment, 2019

Punjab State Electricity Regulatory Commission (Terms and Conditions for intra-State Open Access) (8th Amendment) Regulations, 2019

AmendmentDated 15 Feb 2019Published in the Gazette 15 Feb 2019No. PSERC/Secy/Regu/138.- dated The15th February, 2019

Amends the Terms and Conditions for Intra-state Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the eighth amendment to PSERC's 2011 intra-state open access regulations, notified as No. PSERC/Secy/Regu/138 and published in the Punjab gazette extraordinary on 15 February 2019 (p1). It comes into force from the date of gazette notification (p1) and is made under s.42 read with s.181 of the Electricity Act 2003 (p1). It amends the 2011 regulations as already amended by the first through seventh amendments (p1).

It opens by adding a proviso to Regulation 2 so that deviation settlement for wind and solar generating stations is governed by PSERC's separate 2019 Forecasting, Scheduling and Deviation Settlement regulations rather than the open access regulations (p1). Regulation 3 is rewritten: the definitions of applicant, long-term access, medium-term open access and open access customer are substituted, two new definitions — standby contract demand and standby power — are inserted, and the residual interpretation clause now defers to the Act, CERC regulations or other PSERC regulations (p1–2).

A run of housekeeping substitutions replaces references to the licensee's "Conditions of Supply" with "Supply Code 2014 as amended from time to time" (Regulations 4, 5 and 15; pp2, 5), deletes Regulation 18(2)(g) from the short-term open access procedure (p2), and raises the voltage head in the transmission charge and energy loss provisions from 132/220 kV to "132 kV and above" (Regulations 7 and 12; pp2, 5). Wheeling charges are left to the Commission's annual tariff order (p2).

The substantive addition is in Chapter 5, where new Regulations 27A and 27B create a standby power regime (pp2–4): standby supply from the local distribution licensee under a Commission-approved model agreement, at 11 kV or above, capped per financial year, with a monthly commitment charge on contracted standby demand ("Rs. 35 per kVA per month", p3), plus temporary-supply tariff energy and demand charges for actual drawal, and different billing treatment for customers who are, and are not, already consumers of the licensee.

Regulation 28 gains force-majeure curtailment and banking provisions (p4); Regulation 29 is replaced with an ABT metering requirement (p5); Regulation 31 sets overdrawal and underdrawal imbalance charges against CERC UI/deviation rates (p5); Regulation 32 defers reactive energy charges to the IEGC/State Grid Code (p5); and Regulation 39 extends capacity-utilisation rules to the distribution system, shortens the reference period and widens charges to transmission/wheeling (pp5–6).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Deviation settlement (DSM)

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page