PSERC · Punjab State Electricity Regulatory Commission
Intra-State Open Access Regulations, 2011 — 8th Amendment, 2019
Punjab State Electricity Regulatory Commission (Terms and Conditions for intra-State Open Access) (8th Amendment) Regulations, 2019
AmendmentDated 15 Feb 2019Published in the Gazette 15 Feb 2019No. PSERC/Secy/Regu/138.- dated The15th February, 2019
Amends the Terms and Conditions for Intra-state Open Access Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the eighth amendment to PSERC's 2011 intra-state open access regulations, notified as No. PSERC/Secy/Regu/138 and published in the Punjab gazette extraordinary on 15 February 2019 (p1). It comes into force from the date of gazette notification (p1) and is made under s.42 read with s.181 of the Electricity Act 2003 (p1). It amends the 2011 regulations as already amended by the first through seventh amendments (p1).
It opens by adding a proviso to Regulation 2 so that deviation settlement for wind and solar generating stations is governed by PSERC's separate 2019 Forecasting, Scheduling and Deviation Settlement regulations rather than the open access regulations (p1). Regulation 3 is rewritten: the definitions of applicant, long-term access, medium-term open access and open access customer are substituted, two new definitions — standby contract demand and standby power — are inserted, and the residual interpretation clause now defers to the Act, CERC regulations or other PSERC regulations (p1–2).
A run of housekeeping substitutions replaces references to the licensee's "Conditions of Supply" with "Supply Code 2014 as amended from time to time" (Regulations 4, 5 and 15; pp2, 5), deletes Regulation 18(2)(g) from the short-term open access procedure (p2), and raises the voltage head in the transmission charge and energy loss provisions from 132/220 kV to "132 kV and above" (Regulations 7 and 12; pp2, 5). Wheeling charges are left to the Commission's annual tariff order (p2).
The substantive addition is in Chapter 5, where new Regulations 27A and 27B create a standby power regime (pp2–4): standby supply from the local distribution licensee under a Commission-approved model agreement, at 11 kV or above, capped per financial year, with a monthly commitment charge on contracted standby demand ("Rs. 35 per kVA per month", p3), plus temporary-supply tariff energy and demand charges for actual drawal, and different billing treatment for customers who are, and are not, already consumers of the licensee.
Regulation 28 gains force-majeure curtailment and banking provisions (p4); Regulation 29 is replaced with an ABT metering requirement (p5); Regulation 31 sets overdrawal and underdrawal imbalance charges against CERC UI/deviation rates (p5); Regulation 32 defers reactive energy charges to the IEGC/State Grid Code (p5); and Regulation 39 extends capacity-utilisation rules to the distribution system, shortens the reference period and widens charges to transmission/wheeling (pp5–6).
Read with this
The regulation
Amendments and corrections
- Dated 4 May 2012Intra-State Open Access Regulations, 2011 — Ist Amendment, 2012
- Dated 13 Dec 2012Terms & Conditions for intra-State Open Access Regulations, 2011 — 2nd Amendment, 2012
- Dated 2 Sep 2013Punjab Intra-state Open Access Regulations, 2011 — 3rd Amendment, 2013
- Dated 17 Sep 2014Intra-state Open Access Regulations, 2011 — 4th Amendment, 2014
- Dated 1 Jun 2015Intra-State Open Access Regulations, 2011 — 5th Amendment, 2015
- Dated 21 Jan 2016Intra-state Open Access Regulations, 2011 — 6th Amendment, 2016
- Dated 3 Feb 2016Intra-State Open Access Regulations, 2011 — 7th Amendment, 2016
- Dated 17 Oct 2019Intra-State Open Access Regulations, 2011 — 9th Amendment, 2019
- Dated 2 Jun 2023Intra-State Open Access Regulations, 2011 — 10th Amendment, 2023
- Dated 12 Oct 2023Intra-State Open Access (Terms and Conditions) Regulations, 2011 — 11th Amendment, 2023
- Dated 14 Jul 2025Intra-State Open Access Regulations, 2011 — 12th Amendment, 2025
- Dated 12 May 2026Intra-State Open Access Regulations, 2011 — 13th Amendment, 2026
Commencement notices and reasons
- Dated 29 Jun 2011Intra-state Open Access Regulations, 2011 — Statement of Reasons
- Dated 31 May 2023Intra-State Open Access (10th Amendment) Regulations, 2022 — Order, 2023
- Dated 11 Oct 2023Intra-State Open Access (11th Amendment) Regulations, 2023 — Order
- Dated 11 Jul 2025Intra-State Open Access (12th Amendment) Regulations, 2025 — Order
- Dated 12 May 2026Intra-State Open Access (13th Amendment) Regulations, 2026 — Order
Procedures and orders made under it
- Dated 5 Jul 2011Intra-state Open Access Charges Order, 5 July 2011
- Dated 5 Dec 2011Intra-state Open Access Charges — Effective Date Order, 5 December 2011
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.