Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Intra-State Open Access (13th Amendment) Regulations, 2026 — Order

Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) (13 th Amendment) Regulations, 2026

OrderDated 12 May 2026

Read with the Terms and Conditions for Intra-state Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a PSERC order dated 12.05.2026 (p1, p8) disposing of objections to the draft PSERC (Terms and Conditions for Intra-State Open Access) (13th Amendment) Regulations, 2026 and simultaneously giving effect to the amendments. The draft was floated to ease banking under Green Energy Open Access; a public notice ran in newspapers on 17.03.2026 and on the Commission's website, and a public hearing was held on 22.04.2026 (p1–2).

Part I (p1) sets out the problem: the third proviso to Regulation 28(6), inserted by the 10th Amendment, lets banked energy be carried forward month to month only to the end of the financial year, after which it lapses without compensation. A parallel draft first amendment to the PSERC (Harnessing Captive Power Generation) Regulations, 2026 was also proposed to keep the two instruments in step.

Part II A (p2) amends the opening words of Regulation 28(6) so that "Green Energy open access consumers" includes captive users taking power from renewable-energy-based CGPs connected to the intra-state transmission and/or distribution system. PSPCL and PSTCL concurred.

Part II B (p2–6) substitutes Clause (iii) of Regulation 28(6), replacing the financial-year cycle with a settlement period running 1 June to 31 May, with unutilized banked energy lapsing without compensation and unutilized surplus power left to the Electricity (Promoting Renewable Energy to Green Energy Open Access) Amendment Rules, 2023. Objections from the Steel Furnace Association of India (compensation for dumped power, peak-season mismatch, long-term visibility) and from PSPCL and PSTCL (cost of April–May drawal) are recorded and rejected with reasons. Because FY 2025-26 had already ended, the draft's transitional proviso extending that year's settlement period to 31 May 2026 was dropped (p5–6), and the Commission clarified that the settlement period for FY 2026-27 runs 1 April 2026 to 31 May 2027 (p6).

Part II C (p6–8) records further suggestions by Harish Anand — daytime drawal of banked power, a shorter peak window, linking banking to contract demand, and permitting open access up to 125% of contract demand to match the Industrial and Business Development Policy — which the Commission finds outside the scope of the draft and refers to PSPCL/PSTCL for views.

Standard name
Open Access Regulations
Primary topics
Green energy open access, Energy banking

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document