PSERC · Punjab State Electricity Regulatory Commission

Terms & Conditions for intra-State Open Access Regulations, 2011 — 2nd Amendment, 2012

Punjab State Electricity Regulatory Commission (Terms & Conditions for intra-State Open Access) (2 nd Amendment) Regulations, 2012

AmendmentDated 13 Dec 2012No. PSERC/Secy/Reg/77 dated The 13th Dec, 2012

Amends the Terms and Conditions for Intra-state Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page notification by the Punjab State Electricity Regulatory Commission amending its 2011 intra-state open access regulations. Regulation 1 gives the short title and provides that the amendment comes into force from the date of publication in the State's official Gazette (Gazette date not printed) (p1). Regulation 2 substitutes the Note under Regulation 25 of the 2011 Regulations (p1). The substituted note deals with wheeling of power generated from NRSE projects. For NRSE generation consumed within the State, transmission and wheeling charges are levied at 2% of the energy injected into the State Grid, irrespective of distance, with an additional 2% of total energy to be injected at the injection point(s); 10% of the average revenue realised by the distribution licensee from that additional injection is passed to the STU/transmission licensee to compensate transmission charges. For NRSE generation from outside the State, full transmission and wheeling charges apply. Nothing else in the 2011 framework is touched.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document