PSERC · Punjab State Electricity Regulatory Commission
Intra-State Open Access (11th Amendment) Regulations, 2023 — Order
Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) (11 th Amendment) Regulations, 2023
OrderDated 11 Oct 2023
Read with the Terms and Conditions for Intra-state Open Access Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is PSERC's decision order of 11.10.2023 closing the consultative process on the draft Eleventh Amendment to its Intra-State Open Access Regulations, and approving that amendment with modifications (p1, p13). It is a reasons-and-decision document, not the notified regulation itself: the amended wording of each provision appears inside the Commission's analysis of the objections.
The background section recalls that the Tenth Amendment (notification dated 05.06.2023) had already imported the Centre's Green Energy Open Access Rules into the PSERC framework, and that the Ministry of Power's Second Amendment Rules of 23 May 2023 lowered green energy open access eligibility to consumers with 100 kW or more and exempted offshore wind from additional surcharge (p1). The draft amendment was publicised on 21.07.2023, drew four objectors — PSTCL, Centre for Energy Regulation, CIVIS and PSPCL — and was heard on 09.08.2023, with written replies from the two licensees in September 2023 (pp1–2).
Section B takes the four proposed changes one by one, reproducing each objection, the licensees' reply and the Commission's analysis. The bulk concerns Regulation 3(1): the definition of a Green Energy Open Access Consumer, and the permission to aggregate multiple connections within one distribution division to reach the threshold (pp2–9). PSTCL and PSPCL warned of a flood of small consumers, of scheduling and deviation-accounting load on SLDC, and asked for a minimum individual connection load, division-level accounting and smart/ABT metering; the Commission declined, holding that the Central Rules fix no minimum and that Regulation 13 of the DSM Regulations 2020 already places energy accounting of distribution-connected open access consumers with the distribution licensee's billing centre (pp3–6). It added a new proviso to Regulation 10(3) requiring multi-connection consumers to intimate in advance the share of renewable generation to each connection (p6), and answered CER's question on whether "multiple connections" means one or several consumers by reference to Regulation 6.5 of the Electricity Supply Code, 2014 (pp6–8).
The remaining three items are shorter: substitution of the second proviso to Regulation 10(3) on eligibility and computation of sanctioned contract demand (pp9–10); substitution of the fourth proviso to Regulation 27(2) exempting offshore wind commissioned up to December 2032 from additional surcharge, with PSPCL's request for ARR compensation not accepted (pp11–12); and substitution of Regulation 42(1) tying open access customers' RPO compliance to the PSERC RPO Regulations, 2022, which all objectors accepted (pp12–13). The order ends by approving the amendment "with the modifications as discussed above", signed by the Member and Chairperson (p13).
Read with this
The regulation
Amendments and corrections
- Dated 4 May 2012Intra-State Open Access Regulations, 2011 — Ist Amendment, 2012
- Dated 13 Dec 2012Terms & Conditions for intra-State Open Access Regulations, 2011 — 2nd Amendment, 2012
- Dated 2 Sep 2013Punjab Intra-state Open Access Regulations, 2011 — 3rd Amendment, 2013
- Dated 17 Sep 2014Intra-state Open Access Regulations, 2011 — 4th Amendment, 2014
- Dated 1 Jun 2015Intra-State Open Access Regulations, 2011 — 5th Amendment, 2015
- Dated 21 Jan 2016Intra-state Open Access Regulations, 2011 — 6th Amendment, 2016
- Dated 3 Feb 2016Intra-State Open Access Regulations, 2011 — 7th Amendment, 2016
- Dated 15 Feb 2019Intra-State Open Access Regulations, 2011 — 8th Amendment, 2019
- Dated 17 Oct 2019Intra-State Open Access Regulations, 2011 — 9th Amendment, 2019
- Dated 2 Jun 2023Intra-State Open Access Regulations, 2011 — 10th Amendment, 2023
- Dated 12 Oct 2023Intra-State Open Access (Terms and Conditions) Regulations, 2011 — 11th Amendment, 2023
- Dated 14 Jul 2025Intra-State Open Access Regulations, 2011 — 12th Amendment, 2025
- Dated 12 May 2026Intra-State Open Access Regulations, 2011 — 13th Amendment, 2026
Commencement notices and reasons
- Dated 29 Jun 2011Intra-state Open Access Regulations, 2011 — Statement of Reasons
- Dated 31 May 2023Intra-State Open Access (10th Amendment) Regulations, 2022 — Order, 2023
- Dated 11 Jul 2025Intra-State Open Access (12th Amendment) Regulations, 2025 — Order
- Dated 12 May 2026Intra-State Open Access (13th Amendment) Regulations, 2026 — Order
Procedures and orders made under it
- Dated 5 Jul 2011Intra-state Open Access Charges Order, 5 July 2011
- Dated 5 Dec 2011Intra-state Open Access Charges — Effective Date Order, 5 December 2011
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.