Intra-State Open Access (11th Amendment) Regulations, 2023 — Order

Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) (11 th Amendment) Regulations, 2023

OrderDated 11 Oct 2023

Read with the Terms and Conditions for Intra-state Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is PSERC's decision order of 11.10.2023 closing the consultative process on the draft Eleventh Amendment to its Intra-State Open Access Regulations, and approving that amendment with modifications (p1, p13). It is a reasons-and-decision document, not the notified regulation itself: the amended wording of each provision appears inside the Commission's analysis of the objections.

The background section recalls that the Tenth Amendment (notification dated 05.06.2023) had already imported the Centre's Green Energy Open Access Rules into the PSERC framework, and that the Ministry of Power's Second Amendment Rules of 23 May 2023 lowered green energy open access eligibility to consumers with 100 kW or more and exempted offshore wind from additional surcharge (p1). The draft amendment was publicised on 21.07.2023, drew four objectors — PSTCL, Centre for Energy Regulation, CIVIS and PSPCL — and was heard on 09.08.2023, with written replies from the two licensees in September 2023 (pp1–2).

Section B takes the four proposed changes one by one, reproducing each objection, the licensees' reply and the Commission's analysis. The bulk concerns Regulation 3(1): the definition of a Green Energy Open Access Consumer, and the permission to aggregate multiple connections within one distribution division to reach the threshold (pp2–9). PSTCL and PSPCL warned of a flood of small consumers, of scheduling and deviation-accounting load on SLDC, and asked for a minimum individual connection load, division-level accounting and smart/ABT metering; the Commission declined, holding that the Central Rules fix no minimum and that Regulation 13 of the DSM Regulations 2020 already places energy accounting of distribution-connected open access consumers with the distribution licensee's billing centre (pp3–6). It added a new proviso to Regulation 10(3) requiring multi-connection consumers to intimate in advance the share of renewable generation to each connection (p6), and answered CER's question on whether "multiple connections" means one or several consumers by reference to Regulation 6.5 of the Electricity Supply Code, 2014 (pp6–8).

The remaining three items are shorter: substitution of the second proviso to Regulation 10(3) on eligibility and computation of sanctioned contract demand (pp9–10); substitution of the fourth proviso to Regulation 27(2) exempting offshore wind commissioned up to December 2032 from additional surcharge, with PSPCL's request for ARR compensation not accepted (pp11–12); and substitution of Regulation 42(1) tying open access customers' RPO compliance to the PSERC RPO Regulations, 2022, which all objectors accepted (pp12–13). The order ends by approving the amendment "with the modifications as discussed above", signed by the Member and Chairperson (p13).

Standard name
Open Access Regulations
Primary topics
Open access, Green energy open access, Open access charges

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document