Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Intra-State Open Access (Terms and Conditions) Regulations, 2011 — 11th Amendment, 2023

Punjab State Electricity Regulatory Commission (Terms and Conditions for intra-State Open Access) (11th Amendment) Regulations, 2023

AmendmentDated 12 Oct 2023Published in the Gazette 13 Oct 2023No. PSERC/Secy/Regu. 180 dated The 12th October, 2023

Amends the Terms and Conditions for Intra-state Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the eleventh amendment to PSERC's 2011 intra-state open access regulations, issued by the Commission on 12 October 2023 and gazette-published on 13 October 2023 (p1). It is a short, operative amendment confined to four regulations of the Principal Regulations.

Regulation 3(1) gains a new definition — "Green Energy Open Access Consumer" — built around a sanctioned contracted demand threshold of 100 kVA or more, whether through a single connection or multiple connections aggregating to that level in the same electricity division, with captive consumers excluded (p1). Regulation 10, which governs eligibility and conditions, gains provisos tying eligibility for green energy open access to that same 100 kVA threshold and to the Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, plus rules for consumers with multiple connections (one or more of them without sanctioned contract demand), advance intimation of the share of renewable generation to each connection, and a pointer to Chapter 6 for scheduling, metering and losses (p2). Regulation 27(2)'s fourth proviso is substituted to exempt offshore wind projects commissioned up to December 2032 from additional surcharge when supplying open access consumers (p2). Regulation 42(1) is replaced so that each open access customer must comply with PSERC's Renewable Purchase Obligation and its Compliance Regulations, 2022, as amended (p2).

A closing Note lists the Principal Regulations and all prior amendments with their notification numbers and gazette dates (p1–3).

Standard name
Open Access Regulations
Primary topics
Open access, Green energy open access, Open access charges

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗