Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Terms and Conditions for Intra-state Open Access Regulations, 2011

Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations, 2011

RegulationDated 1 Jul 2011No. PSERC/Secy/Reg/57 dated The 1st July, 2011

13 amendments to it are on Voltaic, the latest dated 12 May 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software, from pages 1 to 50 of 63. Check the regulator's original before you rely on it.

These are PSERC's principal intra-state open access regulations, notified on 1 July 2011 under Section 42 read with Section 181 of the Electricity Act, 2003 (p1). They apply to use of the intra-state transmission system and/or distribution systems of licensees in Punjab, including use alongside inter-state transmission (p1). Chapter 1 (p1–4) gives the title, commencement on Gazette notification, extent and definitions. Chapter 2 (p5–10) sets connectivity: applications to the STU for 132 kV and above, STU processing and connection agreements; applications to distribution licensees by generating stations; and other connectivity through the Supply Code. Chapter 3 (p11–13) provides eligibility for open access — generally consumers with demand of 1 MW and above connected at 11 kV or above, subject to feeder exclusions, with generating plants allowed wheeling — and preserves existing arrangements for distribution licensees, existing open access users and BBMB. Chapter 4 (p14–39) is the procedural core: categories, application forms, nodal agencies, fees, documents, timeframes, applicable charges and losses in tables; detailed long-term, medium-term and short-term open access procedures; consent and deemed-consent; defaulters; and allotment priority. Chapter 5 (p40–45) covers transmission charges, scheduling/system operation charges, wheeling charges, cross-subsidy surcharge and additional surcharge. Chapter 6 (p46–48) covers scheduling, metering and energy losses. Chapter 7 begins imbalance/reactive energy charges, overdrawal/underdrawal and banking. Inter-state matters are expressly deferred to CERC regulations; intra-state procedures are self-contained.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Connectivity and GNA

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document