These are PSERC's principal intra-state open access regulations, notified on 1 July 2011 under Section 42 read with Section 181 of the Electricity Act, 2003 (p1). They apply to use of the intra-state transmission system and/or distribution systems of licensees in Punjab, including use alongside inter-state transmission (p1). Chapter 1 (p1–4) gives the title, commencement on Gazette notification, extent and definitions. Chapter 2 (p5–10) sets connectivity: applications to the STU for 132 kV and above, STU processing and connection agreements; applications to distribution licensees by generating stations; and other connectivity through the Supply Code. Chapter 3 (p11–13) provides eligibility for open access — generally consumers with demand of 1 MW and above connected at 11 kV or above, subject to feeder exclusions, with generating plants allowed wheeling — and preserves existing arrangements for distribution licensees, existing open access users and BBMB. Chapter 4 (p14–39) is the procedural core: categories, application forms, nodal agencies, fees, documents, timeframes, applicable charges and losses in tables; detailed long-term, medium-term and short-term open access procedures; consent and deemed-consent; defaulters; and allotment priority. Chapter 5 (p40–45) covers transmission charges, scheduling/system operation charges, wheeling charges, cross-subsidy surcharge and additional surcharge. Chapter 6 (p46–48) covers scheduling, metering and energy losses. Chapter 7 begins imbalance/reactive energy charges, overdrawal/underdrawal and banking. Inter-state matters are expressly deferred to CERC regulations; intra-state procedures are self-contained.
Read with this
Amendments and corrections
- Dated 4 May 2012Intra-State Open Access Regulations, 2011 — Ist Amendment, 2012
- Dated 13 Dec 2012Terms & Conditions for intra-State Open Access Regulations, 2011 — 2nd Amendment, 2012
- Dated 2 Sep 2013Punjab Intra-state Open Access Regulations, 2011 — 3rd Amendment, 2013
- Dated 17 Sep 2014Intra-state Open Access Regulations, 2011 — 4th Amendment, 2014
- Dated 1 Jun 2015Intra-State Open Access Regulations, 2011 — 5th Amendment, 2015
- Dated 21 Jan 2016Intra-state Open Access Regulations, 2011 — 6th Amendment, 2016
- Dated 3 Feb 2016Intra-State Open Access Regulations, 2011 — 7th Amendment, 2016
- Dated 15 Feb 2019Intra-State Open Access Regulations, 2011 — 8th Amendment, 2019
- Dated 17 Oct 2019Intra-State Open Access Regulations, 2011 — 9th Amendment, 2019
- Dated 2 Jun 2023Intra-State Open Access Regulations, 2011 — 10th Amendment, 2023
- Dated 12 Oct 2023Intra-State Open Access (Terms and Conditions) Regulations, 2011 — 11th Amendment, 2023
- Dated 14 Jul 2025Intra-State Open Access Regulations, 2011 — 12th Amendment, 2025
- Dated 12 May 2026Intra-State Open Access Regulations, 2011 — 13th Amendment, 2026
Commencement notices and reasons
- Dated 29 Jun 2011Intra-state Open Access Regulations, 2011 — Statement of Reasons
- Dated 31 May 2023Intra-State Open Access (10th Amendment) Regulations, 2022 — Order, 2023
- Dated 11 Oct 2023Intra-State Open Access (11th Amendment) Regulations, 2023 — Order
- Dated 11 Jul 2025Intra-State Open Access (12th Amendment) Regulations, 2025 — Order
- Dated 12 May 2026Intra-State Open Access (13th Amendment) Regulations, 2026 — Order
Procedures and orders made under it
- Dated 5 Jul 2011Intra-state Open Access Charges Order, 5 July 2011
- Dated 5 Dec 2011Intra-state Open Access Charges — Effective Date Order, 5 December 2011
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.