PSERC · Punjab State Electricity Regulatory Commission

Intra-state Open Access Charges Order, 5 July 2011

In the matter of: Determination of charges applicable to the customers seeking Open Access on intra-State transmission and/or distribution system in accordance with Punjab State Electricity Regulatory Commission (Terms and Conditions for intra-State Open Access) Regulations, 2011.

OrderDated 5 Jul 2011

Made under the Terms and Conditions for Intra-state Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a three-page PSERC order that fixes, for the 2011-12 financial year, the rupee-and-paise amounts of every charge an open-access (OA) customer in Punjab must pay for using the intra-state transmission and distribution network. It is the first charge determination issued after the Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations, 2011 came into force on 1 July 2011 (p1).

The order works through the charge heads regulation by regulation. Paragraph 2 takes the transmission tariff already determined in the PSTCL Tariff Order for 2011-12 and converts it into an OA transmission charge, distinguishing short-term OA (levied on energy) from long-term and medium-term OA (levied on contracted capacity), invoking Regulation 23(2)(b) (p1–2). Paragraph 3 does the same for wheeling charges from the PSPCL Tariff Order, with short-term customers at different voltage levels bearing different percentages of the wheeling charge and long-term/medium-term customers paying on contracted capacity, under Regulation 25(5); wheeling of NRSE power is left to the regulations (p2). Paragraph 4 applies Regulation 30(2) to allocate transmission and distribution losses, with the loss burden rising as the connection voltage falls (p3). Paragraph 5 sets cross-subsidy surcharge under Regulation 26(2) separately for large supply, domestic, non-residential, bulk supply and railway traction consumers (p3). Paragraph 6 adds a per-transaction SLDC charge on short-term OA customers, and paragraph 7 states that the PSTCL and PSPCL Tariff Orders of 9 May 2011 stand amended to that extent (p3).

The order is signed by the Chairperson and both Members at Chandigarh and dated 5 July 2011 (p3).

Standard name
Open Access Regulations
Primary topics
Open access charges, Open access, Subsidy and cross-subsidy

Read with this

Procedures and orders made under it

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗