Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Intra-State Open Access (12th Amendment) Regulations, 2025 — Order

Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) (12th Amendment) Regulations, 2025

OrderDated 11 Jul 2025

Read with the Terms and Conditions for Intra-state Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The order is PSERC's decision on the 12th Amendment to its intra-state open access regulations, dated 11.07.2025. It records that draft amendments were published on 22.05.2025, that PSTCL and PSPCL objected, and that a public hearing was held on 29.05.2025 (p1-2). The Commission frames the changes as aligning the open access regulations with tariff orders and earlier orders, including the shift of the peak season to 16 June-15 October and the direction in Petition No. 37 of 2024 on deviation charges (p1).

Part A adds Regulation 23(2)(f) to the Principal Regulations, creating transmission deviation charges for open access customers who use intra-state transmission capacity above their combined LTA/MTOA/STOA. The final clause includes provisos for LTA/MTOA customers also taking STOA and for partial open access/full open access customers with standby arrangements, for whom the charge applies to drawal above admissible drawal or sanctioned contract demand (p2-5). Part B withdraws the proposed Regulation 24(2)(d): the Commission refuses to levy additional SLDC operating charges for overutilization because SLDC's scheduling work does not vary with open access quantum (p5-6).

Part C adds Regulation 25(9), creating wheeling deviation charges at 125% of applicable wheeling charges for full open access customers connected to the distribution system who exceed their combined access, with a proviso for LTA/MTOA with STOA. It also amends the Note to Regulation 25 for NRSE projects, preserving the 2% energy charge but requiring monetary deviation charges, and providing 25% pass-through to the STU/transmission licensee for 132 kV and above (p3-7). Part D substitutes the first proviso to Regulation 28(6)(i), so banked-energy drawal is barred during the peak season and peak load hours as approved in tariff orders rather than fixed dates (p7). Part E declines PSPCL and PSTCL suggestions on restricting open access to sanctioned contract demand, RERC-style BESS conditions, inter-state OA processing fees and the STU share, saying they are outside the current amendment or not yet public-consulted; parties may raise them separately (p8-10).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Energy banking

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document