HPERC · Himachal Pradesh Electricity Regulatory Commission
SLDC Fees and Charges Regulations, 2011 — Statement of Objects and Reasons
Statement of Objects and Reasons
Statement of reasonsDated 28 May 2011Published in the Gazette 22 Mar 2011
The commission's reasons for the SLDC Fees and Charges Regulations, 2011 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is HPERC's Statement of Objects and Reasons for the Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011 — the explanatory note that accompanies the final regulations, not the regulations themselves (p1–2). It records the framing of the draft and the discussion held on 17.03.2011 against the corresponding CERC regulations (p1). It then documents compliance with the previous-publication requirement of s.181(3) of the Electricity Act, 2003: publication of the draft in the Rajpatra, Himachal Pradesh on 22.03.2011, public notices in The Indian Express and Amar Ujala the same day, hosting on the Commission's website and circulation to stakeholders (p1). The objection window closed on 12.04.2011 and no objections or suggestions were received (p1).
Because there was no stakeholder input, the Commission finalised the regulations after internal discussion against the CERC RLDC fees and charges Regulations, 2009 and its own Wheeling and Retail Supply Tariff Regulations, 2011, and the note explains eight changes made to the draft (p1–2): interest on working capital (reg 23(1)(c)), O&M expense indexation (reg 19(3)), deletion of connection fees for short-term open access (reg 26(a)), multi-year filing/control period wording (reg 30(1)), two new regulations on foreign exchange rate variation and hedging cost recovery (regs 33, 34), the business plan filing date in Appendix I and the depreciation schedule in Appendix II. It closes by directing publication in the Official Gazette, dated 28.05.2011 at Shimla (p2).
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.