HPERC · Himachal Pradesh Electricity Regulatory Commission
Multiyear Control Period for SLDC Fees and Charges, 2023
Fixation of Multiyear Control Period
OrderDated 27 Sep 2023No. HPERC-F(1)-1/2018 dated 27th day of September, 2023
Made under the SLDC Fees and Charges Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC's one-page notification fixes the multiyear control period for the Commission's State Load Despatch Centre fees-and-charges regulations. Issued at Shimla on 27 September 2023 (p1), it supersedes the Commission's earlier notification No. HPERC-F(1)-1/2018 dated 29 December 2018, which had been published in the Himachal Pradesh Rajpatra on 02 January 2019 (p1). Using Clause (15) of Regulation 3 of the HPERC (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011, it sets a five-year period starting 01-04-2024 (p1). The notification does not set any fee or charge values, nor does it print an end date or a Gazette publication date for itself. Its practical effect is to define the time window within which the SLDC fee-and-charge framework under the 2011 regulations is to operate.
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.