Statement of reasonsDated 22 Nov 2018
The commission's reasons for the SLDC Fees and Charges Regulations, 2011 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the HPERC's Statement of Reasons for the proposed Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) (Second Amendment) Regulations, 2018. It is not the amendment text itself; it records the consultation record and the Commission's reasoning on suggestions received (p1).
Part 1 sets out the background: the draft was published in the Rajpatra Himachal Pradesh on 08.10.2018 under Electricity Act 2003 provisions; objections were invited through newspapers on 10.11.2018 with 21 days; a public hearing was held on 17.11.2018; only HPSLDS commented (p1).
Part 2 summarises HPLDS's written and oral submissions: SLDC-specific treatment in MYT/ARR, R&M expense linked to average GFA for the nth year rather than prior-year GFA, an employee-expense formula including HRD provision, an LDC Development Fund, incentive/retention allowance, capex flexibility and consistent naming of HPSLDS/SLDC (p2–8). It cites MERC's MYT Regulations 2015 and MERC Order Case 171 of 2017 as precedents (p5–7).
Part 3 gives the Commission's view: no further amendments are needed now; existing regulations already contain enabling provisions; HPLDS should file its business/capex plan with its MYT petition and the Commission will prudence-check requests for R&M, HRD etc. It notes actual ARR was below 10% of approved ARR and negative in FY16 (p8–9). The SoR is dated 22.11.2018 (p9).
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.