HPERC · Himachal Pradesh Electricity Regulatory Commission
SLDC Fees and Charges (First Amendment) Regulations, 2013
Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Charges by State Load Despatch Centre) (First Amendment) Regulations, 2013
AmendmentDated 1 Nov 2013No. HPERC/F(5)(3)(1)(SLDC).- dated the 1st November, 2013
Amends the SLDC Fees and Charges Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the First Amendment to HPERC's 2011 regulations on the levy and collection of fees and charges by the State Load Despatch Centre, notified from Shimla on 1 November 2013 (p1). It rewrites the multi-year tariff (MYT) machinery for the "power system operation company" — the SLDC entity — ahead of the Commission's tariff determination for the control period beginning 1 April 2014 (p1). It comes into force from the date of publication in the Rajpatra, which is not printed (p1), and applies only to tariff orders for control periods starting on or after 1 April 2014 (p1).
Clauses 1–3 adjust definitions and the capital expenditure regime. A definition of "mid-term performance review" is inserted into regulation 3 (p1); regulation 13(4) is replaced so the Commission watches actual capex and capitalisation against the approved schedule, will not normally revisit the approved capital investment plan during the control period, and defers variations in depreciation, interest and return on equity to the mid-term review and end-of-period true-up (p1–2). Regulation 14 is then substituted wholesale with a mid-term review and true-up provision: the principles on which O&M surpluses or deficits, capex, depreciation and financing cost are trued up, pass-through of force majeure, change in law and tax changes as additional charge or rebate, a requirement that the Commission review whether the framework achieved its objectives, and a direction that the end of one control period begins the next (p2).
Clause 4 rewrites regulation 19 on O&M: separate normative trajectories for employee cost, R&M and A&G, the units in which norms are expressed, exclusion of one-time and uncontrollable expenses, and a new O&M cost formula built on a K constant and CPI/WPI inflation indices, with R&M spend ring-fenced to R&M works (p3–4). Clause 5 substitutes regulation 20 on return on equity — a pre-tax base rate of 15.5% grossed up at the applicable tax rate, with worked MAT and corporate-tax illustrations (p5). Clause 6 re-bases the interest benchmark in regulation 23(2) onto the average SBI Base Rate for the six months preceding the MYT filing plus 350 basis points (p5). Clauses 7–8 replace regulation 31(1) on business plan and CAPEX filing and add regulation 31-A, setting the scope and sequence of the mid-term performance review and of true-up at the end of the control period (p5–6). Clause 9 substitutes Appendix-I, the filing-timeline table keyed to regulations 9(2), 12, 14(1) and 31-A (p7).
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.