Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

ARR & Tariff Filing Formats — Power System Operation Company

INDEX OF REGULATORY COMPLIANCE FORMATS FOR ARR & TARIFF FILING BY Power System Operation Company

OrderDated 30 Nov 2016

Made under the SLDC Fees and Charges Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is an undated set of standard regulatory compliance formats for the Annual Revenue Requirement (ARR) and tariff filing by a Power System Operation Company (p1). Page 1 is an index that divides the formats into summary formats S1–S3 and financial formats F1–F18 (p1). The summary group provides the ARR build-up (S1, p2), normative parameters used in tariff calculations (S2 by the body heading, p3), and return on equity (S3 by the body heading, p4); the index lists S2 and S3 in the opposite order (p1).

The financial formats start with operating costs: R&M expenditure (F1, p5), employee cost and provisions (F2, p6) and employee strength (F3, p8). Administration and general expenses (F4, p10) and fixed assets with depreciation (F5, p11) follow. A long debt block covers domestic loans, bonds and leasing (F6A, p12), project-specific loans (F6B, p13), foreign loans (F6C, p14), weighted-average interest and drawdown/IDC calculations (F6D–F6E, pp15–16), and allocation of corporate loans (F6F, p17). Capitalised expenses (F7, p18), grants and subsidies (F8, p19), project/scheme capex (F9, p20) and capital works in progress (F10, pp21–22) are then prescribed.

The closing formats cover working capital (F11, p23), admitted and estimated capital cost (F12–F14, pp24–26), and later capitalisation and its financing through to share capital and reserves (F17–F18, pp29–30); forms F15 and F16 appear only in the index (p1). Across the forms, the filing entity is asked for two previous years, the current year and the control period FY(n+1) to FY(n+3), often project- or package-wise. Notes explain loan terms, refinancing, hedging, COD, IDC, FC and FERV (pp13–17, 26–28). No date, notification number or enabling provision is printed, several forms are title-only.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), ARR and true-up, Tariff determination

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document