OrderDated 30 Nov 2016
Made under the SLDC Fees and Charges Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is an undated set of standard regulatory compliance formats for the Annual Revenue Requirement (ARR) and tariff filing by a Power System Operation Company (p1). Page 1 is an index that divides the formats into summary formats S1–S3 and financial formats F1–F18 (p1). The summary group provides the ARR build-up (S1, p2), normative parameters used in tariff calculations (S2 by the body heading, p3), and return on equity (S3 by the body heading, p4); the index lists S2 and S3 in the opposite order (p1).
The financial formats start with operating costs: R&M expenditure (F1, p5), employee cost and provisions (F2, p6) and employee strength (F3, p8). Administration and general expenses (F4, p10) and fixed assets with depreciation (F5, p11) follow. A long debt block covers domestic loans, bonds and leasing (F6A, p12), project-specific loans (F6B, p13), foreign loans (F6C, p14), weighted-average interest and drawdown/IDC calculations (F6D–F6E, pp15–16), and allocation of corporate loans (F6F, p17). Capitalised expenses (F7, p18), grants and subsidies (F8, p19), project/scheme capex (F9, p20) and capital works in progress (F10, pp21–22) are then prescribed.
The closing formats cover working capital (F11, p23), admitted and estimated capital cost (F12–F14, pp24–26), and later capitalisation and its financing through to share capital and reserves (F17–F18, pp29–30); forms F15 and F16 appear only in the index (p1). Across the forms, the filing entity is asked for two previous years, the current year and the control period FY(n+1) to FY(n+3), often project- or package-wise. Notes explain loan terms, refinancing, hedging, COD, IDC, FC and FERV (pp13–17, 26–28). No date, notification number or enabling provision is printed, several forms are title-only.
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023