Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

SLDC Fee and Charges (Third Amendment) Regulations, 2024 — Finalisation Order

In the matter of finalization of the Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fee and Charges by State Load Despatch Centre) (Third Amendment) Regulations, 2024.

OrderDated 30 Aug 2024

Read with the SLDC Fees and Charges Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

An HPERC order of 30 August 2024 that closes the consultation on the draft Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fee and Charges by State Load Despatch Centre) (Third Amendment) Regulations, 2024 and approves it for notification without change (p1, p3). It is a decision record, not the amendment text — the amended clauses themselves are not reproduced here.

Pages 1–3 recite the background: the Principal Regulations of 2011 and their first and second amendments, and the Commission's stated reason for amending — to make the SLDC more effective in handling its operations and to respond to the depreciation-schedule changes made in CERC's 2019 and 2024 RLDC fees and charges regulations (p1). The draft was published in the Rajpatra on 8 July 2024 under s.181(1) of the Electricity Act 2003, publicised in two newspapers on 11 July 2024 and on the Commission's website, with major stakeholders (industry associations, State Government, Directorate of Energy, HIMURJA, the consumers' representative and the distribution licensee) asked to respond by 7 August 2024 (p1–2). One written submission was received, from HPSLDC, and a public hearing was held on 16 August 2024 (p2).

Page 2 sets out HPSLDC's two counter-proposals — a wider definition of 'user' in Regulation 3(26) and a change to the sharing of SLDC charges under Regulation 29(4) — and the Commission's refusal of both: the existing provisions are sufficient, and statically fixing a percentage of ARR recovery would defeat the purpose of recovering charges from all customers in proportion to contracted capacity. The existing split of the SLDC's monthly ARR across transmission licensees, distribution licensees (including captive generating plants) and buyers is set out in the table on p2.

Page 3 records the approval and signatures; page 4 is Annexure-'A', listing the three participants at the public hearing.

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges

Read with this

The regulation

Commencement notices and reasons

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document