HPERC · Himachal Pradesh Electricity Regulatory Commission
SLDC Fee and Charges (Third Amendment) Regulations, 2024 — Finalisation Order
In the matter of finalization of the Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fee and Charges by State Load Despatch Centre) (Third Amendment) Regulations, 2024.
OrderDated 30 Aug 2024
Read with the SLDC Fees and Charges Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
An HPERC order of 30 August 2024 that closes the consultation on the draft Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fee and Charges by State Load Despatch Centre) (Third Amendment) Regulations, 2024 and approves it for notification without change (p1, p3). It is a decision record, not the amendment text — the amended clauses themselves are not reproduced here.
Pages 1–3 recite the background: the Principal Regulations of 2011 and their first and second amendments, and the Commission's stated reason for amending — to make the SLDC more effective in handling its operations and to respond to the depreciation-schedule changes made in CERC's 2019 and 2024 RLDC fees and charges regulations (p1). The draft was published in the Rajpatra on 8 July 2024 under s.181(1) of the Electricity Act 2003, publicised in two newspapers on 11 July 2024 and on the Commission's website, with major stakeholders (industry associations, State Government, Directorate of Energy, HIMURJA, the consumers' representative and the distribution licensee) asked to respond by 7 August 2024 (p1–2). One written submission was received, from HPSLDC, and a public hearing was held on 16 August 2024 (p2).
Page 2 sets out HPSLDC's two counter-proposals — a wider definition of 'user' in Regulation 3(26) and a change to the sharing of SLDC charges under Regulation 29(4) — and the Commission's refusal of both: the existing provisions are sufficient, and statically fixing a percentage of ARR recovery would defeat the purpose of recovering charges from all customers in proportion to contracted capacity. The existing split of the SLDC's monthly ARR across transmission licensees, distribution licensees (including captive generating plants) and buyers is set out in the table on p2.
Page 3 records the approval and signatures; page 4 is Annexure-'A', listing the three participants at the public hearing.
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.