HPERC · Himachal Pradesh Electricity Regulatory Commission
Notification of Multi Year Control Period, 2011
Notification of Multi Year Control Period
OrderDated 31 May 2011No. HPERC/SLDC/479 (Regulation) dated 31.05.2011
Made under the SLDC Fees and Charges Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This one-page HPERC notification (p1) fixes the multiyear control period for the Commission's (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011. Issued on 31.05.2011 under regulation 3(15) of those regulations, it sets a three-year control period starting 01.04.2011 (p1). It does not itself set any fee or charge; it only determines the period over which the regulations' fee-and-charge framework is to operate. The notification is signed by order of the Commission by the Secretary and carries number HPERC/SLDC/479 (Regulation) (p1). Because the stated start date precedes the notification date, the control period runs retrospectively from the beginning of financial year 2011-12. No end date is printed, and no repeal, savings or transitional clause appears.
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.