HPERC · Himachal Pradesh Electricity Regulatory Commission
SLDC Fees and Charges Regulations, 2011
Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011
RegulationDated 28 May 2011No. HPERC/SLDC/479 dated 28th May, 2011
3 amendments to it are on Voltaic, the latest dated 30 Aug 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are HPERC’s principal regulations for how the State Load Despatch Centre (SLDC) recovers its costs from grid users in Himachal Pradesh. Made under section 181(2)(g) read with section 32(3) of the Electricity Act, 2003, they extend to the whole State and come into force on publication in the Rajpatra, though no Gazette date is printed (p1). Part I sets the scope and definitions, binding users of the intra-State transmission system, transmission licensees and generating stations monitored or serviced by SLDC (p1–4). Part II establishes the SLDC as the State’s apex body for integrated operation and lists its scheduling, despatch, monitoring, energy-accounting and RLDC-coordination functions, its duties, a trading prohibition, and a requirement to keep separate accounts (p4–6). Part III lays down the guiding principles: a multi-year tariff framework, business plan and CAPEX plan approval, baseline values, and true-up and review at the end of the control period (p6–10). Part IV deals with capital cost, additional capitalisation and the debt-equity ratio for fresh capitalisation (p11–12). Part V computes annual charges: ARR components, O&M formula, return on equity, interest and finance charges, depreciation, working-capital interest, income from charges, and billing and payment terms including late-payment surcharge and rebates (p12–18). Part VI provides for SLDC fees and charges — connection fee, registration fee and monthly SLDC charges allocated by contracted capacity — and security deposit requirements (p18–19). Part VII prescribes the multi-year filing procedure and periodic returns (p20–21). Part VIII covers foreign-exchange variation and hedging recovery, orders and practice directions, removal of difficulties, relaxation, interpretation, enquiry and savings (p21–23). The appendices give filing timelines, depreciation rates and the registration application format (p24–28).
Read with this
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.