Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

SLDC Fees and Charges (Second Amendment) Regulations, 2018

Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) (Second Amendment) Regulations, 2018

AmendmentDated 22 Nov 2018No. HPERC-F(1)-4/2018 dated 22nd November, 2018

Amends the SLDC Fees and Charges Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to HPERC's 2011 regulations governing the fees and charges the State Load Despatch Centre may levy and collect. Issued from Shimla on 22 November 2018 as Notification No. HPERC-F(1)-4/2018, it is framed under s.181(2)(zd)–(zf) read with ss.61, 62 and 86 of the Electricity Act, 2003, and commences from publication in the Rajpatra (p1–2). The stated purpose is to align the 2011 regulations with the National Tariff Policy 2016, CERC methodologies and two other HPERC regulations (terminal benefits cost sharing, 2015; regulatory accounting reporting, 2014), and to close gaps and discrepancies before the control period beginning 1 April 2019 (p1).

The amendment is drafted as eight clauses that rewrite or insert specific provisions of the parent regulations. Regulation 3's definitions are expanded with accounting statements, a broad change-in-law definition, force majeure, MCLR and prudence check (p2–3). Regulation 8 is replaced to require an accounting manual, annual audited regulatory accounts filed within seven months of year end, and separate accounts and sub-balance-sheets for each Power System Operation Company business, with rules for allocating joint and common costs (p3–4). New regulation 13-A prescribes how consumer contributions, deposit works, grants and capital subsidies are treated in the revenue requirement, denying depreciation, return on equity and interest on the financed portion (p4). Regulation 16 is replaced by a discretionary, prudence-checked additional capitalisation regime with exclusions and anti-double-claiming provisos (p5–6). Regulation 21(2) and regulation 23 are reworked to put interest on loans and on working capital on an MCLR-plus-margin basis, with a carrying-cost provision for true-up amounts above or below those in the tariff order (p5–6).

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, Tariff determination, Return, financing and working capital

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document