HPERC · Himachal Pradesh Electricity Regulatory Commission
SLDC Fees and Charges (Second Amendment) Regulations, 2018
Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) (Second Amendment) Regulations, 2018
AmendmentDated 22 Nov 2018No. HPERC-F(1)-4/2018 dated 22nd November, 2018
Amends the SLDC Fees and Charges Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the second amendment to HPERC's 2011 regulations governing the fees and charges the State Load Despatch Centre may levy and collect. Issued from Shimla on 22 November 2018 as Notification No. HPERC-F(1)-4/2018, it is framed under s.181(2)(zd)–(zf) read with ss.61, 62 and 86 of the Electricity Act, 2003, and commences from publication in the Rajpatra (p1–2). The stated purpose is to align the 2011 regulations with the National Tariff Policy 2016, CERC methodologies and two other HPERC regulations (terminal benefits cost sharing, 2015; regulatory accounting reporting, 2014), and to close gaps and discrepancies before the control period beginning 1 April 2019 (p1).
The amendment is drafted as eight clauses that rewrite or insert specific provisions of the parent regulations. Regulation 3's definitions are expanded with accounting statements, a broad change-in-law definition, force majeure, MCLR and prudence check (p2–3). Regulation 8 is replaced to require an accounting manual, annual audited regulatory accounts filed within seven months of year end, and separate accounts and sub-balance-sheets for each Power System Operation Company business, with rules for allocating joint and common costs (p3–4). New regulation 13-A prescribes how consumer contributions, deposit works, grants and capital subsidies are treated in the revenue requirement, denying depreciation, return on equity and interest on the financed portion (p4). Regulation 16 is replaced by a discretionary, prudence-checked additional capitalisation regime with exclusions and anti-double-claiming provisos (p5–6). Regulation 21(2) and regulation 23 are reworked to put interest on loans and on working capital on an MCLR-plus-margin basis, with a carrying-cost provision for true-up amounts above or below those in the tariff order (p5–6).
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.