HPERC · Himachal Pradesh Electricity Regulatory Commission

Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013

Himachal Pradesh Electricity Regulatory Commission (Formats for Multi Year Tariff Filings by the Power System Operation Company / State Load Despatch Centre) Order, 2013

OrderDated 1 Nov 2013No. HPERC/F(5)(3)(1)(SLDC) dated 1st November, 2013

Made under the SLDC Fees and Charges Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page notification plus an annexure index from the Himachal Pradesh Electricity Regulatory Commission, issued in Shimla on 1 November 2013 under the Commission's SLDC fees-and-charges regulations of 2011 and its tariff-filing guidelines and formats regulations of 2005 (p1). Its purpose is narrow and procedural: it revises the formats in which the Power System Operation Company / State Load Despatch Centre must make its Multi Year Tariff filings, for the control period beginning 1 April 2014 and thereafter (p1).

The operative part has three paragraphs. Paragraph 1 gives the short title — the HPERC (Formats for Multi Year Tariff Filings by the Power System Operation Company / State Load Despatch Centre) Order, 2013 — and states that it takes effect on publication in the Himachal Pradesh Rajpatra (p1). Paragraph 2 defines 'Act', 'Annexure', 'Form' and 'regulations', and imports Act and regulation definitions for everything else (p1). Paragraph 3 requires MYT filings to be made in the annexed Forms, permits their use with such modifications as each case requires, allows a Commission-approved form for contingencies not covered, and requires the Forms to be hosted on the Commission's website (p1).

The annexure on p2 is an index only: it groups formats into summary formats (annual revenue requirement, return on equity, normative parameters) and financial formats spanning O&M and administrative costs, fixed assets and depreciation, loans and interest, capital expenditure and capitalisation, working capital and share capital (p2).

Standard name
SLDC Fees and Charges
Primary topics
Tariff determination, SLDC and RLDC fees and charges, ARR and true-up

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document