HPERC · Himachal Pradesh Electricity Regulatory Commission
Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
Himachal Pradesh Electricity Regulatory Commission (Formats for Multi Year Tariff Filings by the Power System Operation Company / State Load Despatch Centre) Order, 2013
OrderDated 1 Nov 2013No. HPERC/F(5)(3)(1)(SLDC) dated 1st November, 2013
Made under the SLDC Fees and Charges Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page notification plus an annexure index from the Himachal Pradesh Electricity Regulatory Commission, issued in Shimla on 1 November 2013 under the Commission's SLDC fees-and-charges regulations of 2011 and its tariff-filing guidelines and formats regulations of 2005 (p1). Its purpose is narrow and procedural: it revises the formats in which the Power System Operation Company / State Load Despatch Centre must make its Multi Year Tariff filings, for the control period beginning 1 April 2014 and thereafter (p1).
The operative part has three paragraphs. Paragraph 1 gives the short title — the HPERC (Formats for Multi Year Tariff Filings by the Power System Operation Company / State Load Despatch Centre) Order, 2013 — and states that it takes effect on publication in the Himachal Pradesh Rajpatra (p1). Paragraph 2 defines 'Act', 'Annexure', 'Form' and 'regulations', and imports Act and regulation definitions for everything else (p1). Paragraph 3 requires MYT filings to be made in the annexed Forms, permits their use with such modifications as each case requires, allows a Commission-approved form for contingencies not covered, and requires the Forms to be hosted on the Commission's website (p1).
The annexure on p2 is an index only: it groups formats into summary formats (annual revenue requirement, return on equity, normative parameters) and financial formats spanning O&M and administrative costs, fixed assets and depreciation, loans and interest, capital expenditure and capitalisation, working capital and share capital (p2).
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.