Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

ARR & Tariff Filing Formats for Power System Operation Company

INDEX OF REGULATORY COMPLIANCE FORMATS FOR ARR & TARIFF FILING BY Power System Operation Company

OrderDated 30 Nov 2016

Made under the SLDC Fees and Charges Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a set of blank compliance formats, with a one-page index, for a Power System Operation Company's annual revenue requirement (ARR) and tariff filing (p1). It is not a tariff order and sets no numerical tariff values; it tells the filer what schedules to submit and how to lay them out across four previous years, the current year and the five-year control period, using PY/CY/CP abbreviations (p1–2).

The index (p1) splits the filing into three summary formats and eighteen financial formats. S1 aggregates O&M, depreciation, interest and finance charges, return on equity and interest on working capital into the ARR (p2). S2 lists the normative parameters used in tariff calculations, such as base rate of return, tax rate, receivable and O&M months for working capital, and the SBI prime lending rate (p3). S3 computes return on equity from opening/closing equity and additions (p4).

The financial formats collect expense, asset and financing detail. F1–F4 cover repair & maintenance expenditure by asset class, employee cost and provisions, employee strength, and administration & general expenses (pp5–9). F5 gives the fixed-asset and depreciation schedule (p10). F6A–F6F capture domestic and project-specific loans, foreign loans, weighted average interest, IDC/financing-charge drawdown, and allocation of corporate loans (pp11–16). F7–F8 deal with capitalised expenses and contributions, grants and subsidies towards capital assets (pp17–18). F9–F10 track project/scheme-wise capital expenditure and capital works in progress (pp20–22). F11 computes working capital requirements (p23). F12–F14 present admitted capital cost, new-project cost estimates and element-wise capital cost breakup (pp24–26). F17–F18 cover financing of additional capitalisation and share capital/reserves (pp29–30).

Pages 8 and 19 are also missing. Notes require true-up of interest rates with reset dates, refinancing details and hedging information (pp12, 27–29). The text refers to HPERC only through the licence-fee expense line (p9); no enabling statute, notification number or date is printed.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), ARR and true-up, Tariff determination

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document