ARR & Tariff Filing Formats for Power System Operation Company
INDEX OF REGULATORY COMPLIANCE FORMATS FOR ARR & TARIFF FILING BY Power System Operation Company
OrderDated 30 Nov 2016
Made under the SLDC Fees and Charges Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a set of blank compliance formats, with a one-page index, for a Power System Operation Company's annual revenue requirement (ARR) and tariff filing (p1). It is not a tariff order and sets no numerical tariff values; it tells the filer what schedules to submit and how to lay them out across four previous years, the current year and the five-year control period, using PY/CY/CP abbreviations (p1–2).
The index (p1) splits the filing into three summary formats and eighteen financial formats. S1 aggregates O&M, depreciation, interest and finance charges, return on equity and interest on working capital into the ARR (p2). S2 lists the normative parameters used in tariff calculations, such as base rate of return, tax rate, receivable and O&M months for working capital, and the SBI prime lending rate (p3). S3 computes return on equity from opening/closing equity and additions (p4).
The financial formats collect expense, asset and financing detail. F1–F4 cover repair & maintenance expenditure by asset class, employee cost and provisions, employee strength, and administration & general expenses (pp5–9). F5 gives the fixed-asset and depreciation schedule (p10). F6A–F6F capture domestic and project-specific loans, foreign loans, weighted average interest, IDC/financing-charge drawdown, and allocation of corporate loans (pp11–16). F7–F8 deal with capitalised expenses and contributions, grants and subsidies towards capital assets (pp17–18). F9–F10 track project/scheme-wise capital expenditure and capital works in progress (pp20–22). F11 computes working capital requirements (p23). F12–F14 present admitted capital cost, new-project cost estimates and element-wise capital cost breakup (pp24–26). F17–F18 cover financing of additional capitalisation and share capital/reserves (pp29–30).
Pages 8 and 19 are also missing. Notes require true-up of interest rates with reset dates, refinancing details and hedging information (pp12, 27–29). The text refers to HPERC only through the licence-fee expense line (p9); no enabling statute, notification number or date is printed.
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 1 Nov 2013Himachal Pradesh Multi Year Control Period Notification, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023