HPERC · Himachal Pradesh Electricity Regulatory Commission
Himachal Pradesh Multi Year Control Period Notification, 2013
Notification of Multi Year Control Period
OrderDated 1 Nov 2013No. HPERC/F(5)(3)(1) dated 1st November, 2013
Made under the SLDC Fees and Charges Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A one-page notification of the Himachal Pradesh Electricity Regulatory Commission, dated 1 November 2013, that fixes the State's multi-year control period for tariff determination (p1). It declares a control period of five years beginning 01.04.2014, and does so for the purposes of four 2011 Commission regulations: determination of wheeling tariff and retail supply tariff, determination of hydro generation tariff, determination of transmission tariff, and levy and collection of charges by the State Load Despatch Centre (p1).
The notification is issued in supersession of four earlier Commission notifications of 2011 — HPERC/Dis./479, HPERC/Gen/479 and HPERC/Trans/479, all dated 2 March 2011, and HPERC/SLDC/479 dated 2 May 2011 — which had fixed the previous control periods; the supersession reaches the notifications only, not the regulations they sat under (p1). It is issued by order of the Commission and signed by the Secretary. No end date for the control period and no Gazette publication date for this notification are printed (p1).
Read with this
The regulation
- Dated 28 May 2011SLDC Fees and Charges Regulations, 2011
Amendments and corrections
- Dated 1 Nov 2013SLDC Fees and Charges (First Amendment) Regulations, 2013
- Dated 22 Nov 2018SLDC Fees and Charges (Second Amendment) Regulations, 2018
- Dated 30 Aug 2024SLDC Fees and Charges Regulations, 2011 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 31 May 2011HPERC (Format for Multi Year Tariff Fillings by Power System Operation Company/ State Load Despatch Centre) Order, 2011
- Dated 31 May 2011Notification of Multi Year Control Period, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by Power System Operation Company / SLDC Order, 2013
- Dated 30 Nov 2016ARR & Tariff Filing Formats for Power System Operation Company
- Dated 30 Nov 2016ARR & Tariff Filing Formats — Power System Operation Company
- Dated 27 Sep 2023Multiyear Control Period for SLDC Fees and Charges, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.