Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Operationalisation of Merit Order Stack and Technical Minimum at 55% under State Grid Code Regulations, 2020 — Notification

NOTIFICATION OF OPERATIONALISATION OF PRINCIPLES FOR MERIT ORDER STACK AND PROVISIONS OF TECHNICAL MINIMUM AT 55% ALONG WITH COMPENSATION MECHANISM AS SPECIFIED UNDER MERC (STATE GRID CODE) REGULATIONS, 2020

NotificationDated 25 Sep 2020

Read with the State Grid Code Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This two-page MERC notification does one thing: it switches on two sets of provisions in the MERC (State Grid Code) Regulations, 2020 (MEGC, 2020) that the regulations themselves had left to be operationalised on a date to be notified separately.

Paragraphs 1–3 (p1) set out the basis. Regulation 1.5 read with Regulations 33.13 and 34.7 of MEGC, 2020 required the Commission to notify dates for operationalising the merit order dispatch (MOD) stack principles and the technical minimum of 55% with its compensation mechanism. The Commission recalls that these were to apply under the existing Final Balancing and Settlement Mechanism (FBSM) framework, subject to FBSM's governing principles and commercial settlement mechanism, with at least a one-month transition from the notification of MEGC, 2020 (Gazetted 2 September 2020). It records SLDC's email of 24 September 2020 confirming that its existing scheduling and billing software can implement the 55% technical minimum.

Paragraph 4 (p1–2) is the operative part. The MOD stack principles in Regulation 33 apply under FBSM from October 2020, with the information-submission timelines operationalised by all stakeholders and SLDC, and SLDC publishing the stack on its website on the 15th of each month, effective from the 16th to the 15th of the following month unless revised. Regulation 34 and Annexure-4 — technical minimum and compensation — apply from 16 October 2020, with compensation payable to generating units.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch

Read with this

The regulation

Amendments and corrections

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document