State Grid Code Regulations, 2020 — Statement of Reasons

Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020

Statement of reasonsDated 2 Sep 2020

The commission's reasons for the State Grid Code Regulations, 2020 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 26 of 77. Check the regulator's original before you rely on it.

This is MERC’s Statement of Reasons dated 2 September 2020 for the Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020 (MEGC 2020), the successor to the 2006 State Grid Code (p1). Its introduction records the statutory mandate under s.86(1)(h) of the Electricity Act 2003 to align the state grid code with CERC’s IEGC, the public consultation on the draft MEGC 2020 and the COVID-19 extension, and the ATE direction to consider the Association of Power Producers’ objections (p1–2). The remainder is a regulation-by-regulation account of stakeholder comments, the Commission’s analysis and decision, and the text of revised provisions, beginning with definitions and scope and running through grid governance, planning, connectivity and metering.

Sections 1–2 deal with definitions and applicability: bulk consumer and InSTS user definitions are revised, solar/wind power park developer and resource adequacy/technical minimum definitions are added, and MEGC scope is extended to RE park developers while excluding ancillary services and traders (p2–4). Sections 3–8 establish and refine grid institutions: a two-tier GCC (Core Group plus Grid Coordination Conference), publication of GCC reports, functional committees, MTC, OCC and MCCC, with new functions for RE curtailment review, metering-defect methodology and SCADA visibility (p4–10). Sections 9–11 cover STU/SLDC roles and RE generator obligations, including SLDC’s daily SCADA report and the RE developer’s scheduling and contract-information duties (p10–12). Sections 12–20 set out planning-code changes: STU as designated agency, resource adequacy statements, IRP and transmission planning horizons/update cycles, augmentation criteria, EHV substation short-circuit and bus-switching rules, HVDC thresholds, and N-1 treatment for wind/solar and 220/132 kV lines (p12–23). Sections 21–23 cover spinning reserves, connection applications by bulk consumers, and metering/connection arrangements, with the supplied text stopping mid-way through section 23 (p23–26).

This is not the operative regulation itself; it documents why the final MEGC 2020 provisions were adopted and quotes the revised clauses.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Network planning and investment, Connectivity and GNA

Read with this

The regulation

Amendments and corrections

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document