This is MERC’s Statement of Reasons dated 2 September 2020 for the Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020 (MEGC 2020), the successor to the 2006 State Grid Code (p1). Its introduction records the statutory mandate under s.86(1)(h) of the Electricity Act 2003 to align the state grid code with CERC’s IEGC, the public consultation on the draft MEGC 2020 and the COVID-19 extension, and the ATE direction to consider the Association of Power Producers’ objections (p1–2). The remainder is a regulation-by-regulation account of stakeholder comments, the Commission’s analysis and decision, and the text of revised provisions, beginning with definitions and scope and running through grid governance, planning, connectivity and metering.
Sections 1–2 deal with definitions and applicability: bulk consumer and InSTS user definitions are revised, solar/wind power park developer and resource adequacy/technical minimum definitions are added, and MEGC scope is extended to RE park developers while excluding ancillary services and traders (p2–4). Sections 3–8 establish and refine grid institutions: a two-tier GCC (Core Group plus Grid Coordination Conference), publication of GCC reports, functional committees, MTC, OCC and MCCC, with new functions for RE curtailment review, metering-defect methodology and SCADA visibility (p4–10). Sections 9–11 cover STU/SLDC roles and RE generator obligations, including SLDC’s daily SCADA report and the RE developer’s scheduling and contract-information duties (p10–12). Sections 12–20 set out planning-code changes: STU as designated agency, resource adequacy statements, IRP and transmission planning horizons/update cycles, augmentation criteria, EHV substation short-circuit and bus-switching rules, HVDC thresholds, and N-1 treatment for wind/solar and 220/132 kV lines (p12–23). Sections 21–23 cover spinning reserves, connection applications by bulk consumers, and metering/connection arrangements, with the supplied text stopping mid-way through section 23 (p23–26).
This is not the operative regulation itself; it documents why the final MEGC 2020 provisions were adopted and quotes the revised clauses.
Read with this
The regulation
- Date not statedState Grid Code Regulations, 2020
Amendments and corrections
- Dated 21 Sep 2026State Grid Code, 2020 — First Amendment Regulations, 2026
Commencement notices and reasons
- Dated 25 Sep 2020Operationalisation of Merit Order Stack and Technical Minimum at 55% under State Grid Code Regulations, 2020 — Notification
- Dated 9 Mar 2022Reactive Energy Accounting Framework for Intra-State Hydro Generating Stations under the State Grid Code Regulations, 2020 — Notification, 2022
- Dated 21 Sep 2026State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
Earlier drafts
- Released with the notice dated 1 Mar 2020Maharashtra State Grid Code Regulations, 2020 — Draft
- Released with the notice dated 1 Mar 2020Explanatory memorandum: Draft State Grid Code Regulations, 2020 — Explanatory Memorandum
- Dated 1 Mar 2020Public notice: Draft State Grid Code Regulations, 2020 — Public Consultation Notice
- Dated 23 Mar 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Extension of Time for Submitting Comments
- Dated 16 Apr 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Comment Deadline Extension Notice, 16 April 2020
- Released with the notice dated 2 Aug 2025State Grid Code (First Amendment) Regulations, 2025 — Draft
- Dated 2 Aug 2025Public notice: Public Notice — Comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
- Released with the notice dated 2 Aug 2025Explanatory memorandum: State Grid Code Regulations, 2020 — First Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 5 Sep 2025Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.