Summary
Summary written by software. Check the regulator's original before you rely on it.
MERC operationalises a framework that the MERC (State Grid Code) Regulations, 2020 had left to a separate commencement date. Pages 1–4 explain why: Regulation 70 of the MYT Regulations, 2019 requires generating stations to inject or absorb reactive energy on MSLDC directions and provides for compensation, with settlement governed by the Grid Code; Regulation 37.16 of the Grid Code required the Commission to notify the date of applicability for intra-State entities (p1). MSLDC reported readiness for only a partial module — condenser-mode reactive energy accounting for hydro generators — and asked to pay MSPGCL's Koyna units from the DSM pool (pp1–2). A DSM Working Group report and MSLDC's draft procedure were placed before the Commission (pp2–4).
The Commission's analysis and ruling (pp4–6) records that Regulation 37.8 allows MSLDC to run hydro units in synchronous condenser mode, and that Annexure-7 of the Grid Code contemplates all TSUs and all generators connected to the InSTS. It nonetheless accepts phased rollout, because grid-level reactive compensation is still inadequate and because kVArh data is missing at locations outside the AMR project (pp3–4). It adopts the Grid Code rate of 13 paise/kVArh escalated by 0.50 paise/kVArh annually as compensation (pp4–6).
The operative direction (p6) starts phase one at 00:00 hrs on Monday, 14 March 2022, covering hydro generators in condenser mode on MSLDC instructions, paid from the State DSM pool account while there are no TSU recoveries; it requires weekly accounts, a review by MSLDC within a year, STU to expedite compensation studies, and all InSTS generating stations to continue following Regulation 37.
The Annexure (pp8–9) is MSLDC's implementation procedure: applicability to hydro stations above 25 MW connected to InSTS, instruction and logging mechanics, weekly 15-minute-block RkVAH meter data from STU, payment priority and pro-rata treatment, DSM portal publication, and a subordination clause to MERC directives and the Grid Code.
Read with this
The regulation
- Date not statedState Grid Code Regulations, 2020
Amendments and corrections
- Dated 21 Sep 2026State Grid Code, 2020 — First Amendment Regulations, 2026
Commencement notices and reasons
- Dated 2 Sep 2020State Grid Code Regulations, 2020 — Statement of Reasons
- Dated 25 Sep 2020Operationalisation of Merit Order Stack and Technical Minimum at 55% under State Grid Code Regulations, 2020 — Notification
- Dated 21 Sep 2026State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
Earlier drafts
- Released with the notice dated 1 Mar 2020Maharashtra State Grid Code Regulations, 2020 — Draft
- Released with the notice dated 1 Mar 2020Explanatory memorandum: Draft State Grid Code Regulations, 2020 — Explanatory Memorandum
- Dated 1 Mar 2020Public notice: Draft State Grid Code Regulations, 2020 — Public Consultation Notice
- Dated 23 Mar 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Extension of Time for Submitting Comments
- Dated 16 Apr 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Comment Deadline Extension Notice, 16 April 2020
- Released with the notice dated 2 Aug 2025State Grid Code (First Amendment) Regulations, 2025 — Draft
- Dated 2 Aug 2025Public notice: Public Notice — Comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
- Released with the notice dated 2 Aug 2025Explanatory memorandum: State Grid Code Regulations, 2020 — First Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 5 Sep 2025Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.