Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Draft State Grid Code Regulations, 2020 — Public Consultation Notice

Inviting Comments, suggestions and/or objections on Draft Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020

Public notice on a draftDated 1 Mar 2020Advertisement No. 13/2019-20 dated 01 March, 2020

Draft

The draft has since been finalised as the State Grid Code Regulations, 2020.

Public notice on the Maharashtra State Grid Code Regulations, 2020 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page public notice by the Secretary, MERC, advertising that the Commission has prepared the draft Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020 (Draft MEGC, 2020), and inviting written comments, suggestions and objections on it (p1).

The notice states that the proposed regulations would supersede the MERC (State Grid Code) Regulations, 2006, and that the draft, together with an Explanatory Memorandum, is downloadable from the Commission's website (p1). It sets out how to respond — two copies (1+1) to the Secretary, MERC at its Mumbai address, in person, by post or by e-mail — and fixes 23 March, 2020 as the last date for submissions to be considered before the draft is finalised (p1). It is dated Mumbai, 01 March, 2020 (p1).

Nothing about the content of the draft grid code itself appears here; the document serves only as the consultation announcement and contact/deadline record.

Standard name
Grid Code

Read with this

The regulation

Amendments and corrections

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document