MERC · Maharashtra Electricity Regulatory Commission
Draft State Grid Code Regulations, 2020 — Explanatory Memorandum
EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (STATE GRID CODE) REGULATIONS, 2020
Explanatory memorandum to a draftReleased with the notice dated 1 Mar 2020
Draft
The draft has since been finalised as the State Grid Code Regulations, 2020.
Explanatory memorandum to the Maharashtra State Grid Code Regulations, 2020 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MERC’s explanatory memorandum, dated March 2020, for the draft MERC (State Grid Code) Regulations, 2020 — the proposed Maharashtra Electricity Grid Code (MEGC). It is not the draft code itself: it explains why the 2006 State Grid Code is being revised and walks through each proposed Part, quoting draft clauses (p1, p7–10, p37).
Pages 7–10 set the background. The Electricity Act, 2003 requires MERC to specify a State Grid Code consistent with the CERC IEGC; the 2006 code is being reviewed in light of IEGC 2010 and its amendments. The memorandum lists the MERC inputs considered (DSM Regulations 2019, MYT Regulations 2019, S&D Code 2019, Metering Code 2019, DSM Procedure 2019 and MOD Guidelines 2019) and the CERC/CEA reports and regulations reviewed. It records that the S&D Code and Metering Code had already been approved and are to form Parts E and H (p8–10).
Pages 10–16 cover Part A, General: scope of application to InSTS users, objectives, reconstitution of the Grid Coordination Committee (GCC) with a wider membership, functional sub-committees (OCC, PCC, MCCC), and stakeholder roles. Pages 16–25 cover Part B, Planning Code: STU as nodal agency, planning criteria, transmission plan preparation and approval, annual rolling plans, and spinning-reserve planning. Pages 26–28 cover Part C, Connection Code: application and STU processing, connection agreements, site responsibility schedules, metering arrangements and voltage-variation reporting.
Pages 28–50 are the largest block, Part D, Operating Code. They explain proposed provisions on generator operation and FGMO, COD declaration, declared-capacity demonstration and penalties, merit-order despatch, compensation for part-load operation, zero scheduling, reserve shutdown, voltage/reactive-power management and reactive-energy settlement, demand estimation and curtailment, outage planning and congestion management. Pages 50–51 describe Part E, which adopts the approved S&D Code. Pages 51–53 cover Part F, Communication Code, including communication availability and cyber security. Pages 53–55 cover Part G, Protection Code; p55 covers Part H, the approved Metering Code; and pp56–57 cover Part I, Miscellaneous — data submission, load-flow studies, compliance monitoring and the list of procedures to be prepared.
The memorandum repeatedly states that the draft is to be finalised after public consultation (p37). It also refers to annexures containing detailed procedures and formats, but they are not reproduced in this explanatory text (p33, p41, p48, p57).
Read with this
The regulation
- Date not statedState Grid Code Regulations, 2020
Amendments and corrections
- Dated 21 Sep 2026State Grid Code, 2020 — First Amendment Regulations, 2026
Commencement notices and reasons
- Dated 2 Sep 2020State Grid Code Regulations, 2020 — Statement of Reasons
- Dated 25 Sep 2020Operationalisation of Merit Order Stack and Technical Minimum at 55% under State Grid Code Regulations, 2020 — Notification
- Dated 9 Mar 2022Reactive Energy Accounting Framework for Intra-State Hydro Generating Stations under the State Grid Code Regulations, 2020 — Notification, 2022
- Dated 21 Sep 2026State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
Earlier drafts
- Released with the notice dated 1 Mar 2020Maharashtra State Grid Code Regulations, 2020 — Draft
- Dated 1 Mar 2020Public notice: Draft State Grid Code Regulations, 2020 — Public Consultation Notice
- Dated 23 Mar 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Extension of Time for Submitting Comments
- Dated 16 Apr 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Comment Deadline Extension Notice, 16 April 2020
- Released with the notice dated 2 Aug 2025State Grid Code (First Amendment) Regulations, 2025 — Draft
- Dated 2 Aug 2025Public notice: Public Notice — Comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
- Released with the notice dated 2 Aug 2025Explanatory memorandum: State Grid Code Regulations, 2020 — First Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 5 Sep 2025Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.