MERC · Maharashtra Electricity Regulatory Commission

State Grid Code (First Amendment) Regulations, 2025 — Draft

Maharashtra Electricity Regulatory Commission (State Grid Code) (First Amendment) Regulations, 2025

Draft amendmentReleased with the notice dated 2 Aug 2025No. MERC/Legal/319- dated __ August, 2025

Draft

A proposal that has since been finalised as the State Grid Code, 2020 — First Amendment Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a draft MERC notification proposing the First Amendment to the Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020 (p1). It is made under the Electricity Act, 2003, extends to the whole State of Maharashtra, and is to commence on publication in the Official Gazette, remaining in force until amended, varied, altered or modified by the Commission (p1). The signature block leaves the day of the August 2025 date blank (p15).

Regulation 2 inserts definitions used across the amendment: Ancillary Services and its reserve categories, Area Control Error by reference to the CERC Indian Electricity Grid Code, Gate Closure for power-exchange bidding, GNA Regulations and GNA Grantee, Minimum Turndown Level tied to CEA flexible-operation norms, and SCED/SCUC (pp1–2). Regulation 34 then sets a technical-minimum schedule for intra-State thermal generating stations connected to the intra-State transmission system, with options for generators to declare a lower minimum and for case-by-case deviations with OEM certification (p2). It deals with SLDC directions to run at or above technical minimum but below normative availability, compensation for part-load operation, station heat rate and auxiliary consumption degradation, secondary fuel oil and start/stop costs, allocation among buyers, annual reconciliation, reporting of emissions, and separate regimes for stations whose tariff is determined under Section 62, adopted under Section 63, or neither determined nor adopted (pp2–7).

The amendment also adjusts the scheduling and despatch code. Regulations 49 and 50.2 make the code applicable to sellers, open access and captive generators, bagasse/biomass and other non-wind/solar renewable generators connected to the intra-State system, while preserving the separate MERC Forecasting, Scheduling and Deviation Settlement regime for wind and solar (pp7–8). Regulation 52 restates day-ahead scheduling principles, deletes an existing clause, and substitutes a detailed daily timeline for ISGS/WRLDC/SLDC, buyer and seller submissions, GNA requisitions, merit-order and renewable priority, load-generation balance, target despatch schedules and forms (pp8–12). Regulation 53 substitutes schedule-revision provisions for forced outages, transmission bottlenecks, backing down, short-term bilateral transactions and buyer drawal revisions, using the 7th/8th time-block convention (pp12–14). Finally, clause 2 of Annexure-4 is amended to state the compensation mechanism's applicability, including stations whose tariff is adopted and State entities selling under short-term open access whose tariff is not adopted (p14).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Ancillary services and reserves

Read with this

The regulation

Amendments and corrections

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document