Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Maharashtra State Grid Code Regulations, 2020 — Draft

Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020

Draft regulationReleased with the notice dated 1 Mar 2020

Draft

A proposal that has since been finalised as the State Grid Code Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC’s draft Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020, made under the Electricity Act 2003 to consolidate technical and commercial rules for the intra-state transmission system (InSTS) in Maharashtra. It is dated 1 March 2020 and signed by the Secretary; the text says it will come into force on publication in the Official Gazette, but no Gazette date is printed (p5, p7, p85). It would repeal and supersede the MEGC 2006, save for actions already taken, and refers to the CERC IEGC as a gap-filler and as prevailing on inconsistency (p7, p11).

Part A (p7–21) contains the short title, definitions, objective and scope. It applies to generators connected to InSTS, transmission licensees including the STU, SLDC, distribution licensees including deemed licensees and Indian Railways, open access consumers and EHV consumers connected to InSTS (p12–13). It reconstitutes the Grid Coordination Committee, sets out its review role and creates functional committees—MTC, OCC, PCC and MCCC—while allocating roles to STU, SLDC, transmission licensees, distribution licensees, Users, generators and QCAs (p13–21). Existing licensees and Users get a transition period for listed compliance items (p13).

Part B (p21–33) is the Planning Code. It covers generation resource adequacy and integrated resource planning, InSTS planning, planning criteria for EHV substations, wind/solar and HVDC, planning data and spinning reserve planning, and arrangements for monitoring implementation of the transmission plan.

Part C (p33–42) is the Connection Code. It specifies connection and safety standards, the application and approval process, connection agreements, grid parameter variations, equipment and fault-clearance requirements, protection, data and communication facilities, system recording instruments, and Site Responsibility Schedules.

Part D (p42–74) is the Operating Code. It covers operating procedures and system security, generator operation including governor and AVR requirements, treatment of renewable generation, declaration of commercial operation for generation/transmission/communication assets, declared-capacity demonstration, merit order despatch, technical minimum compensation, zero scheduling and reserve shutdown, voltage and reactive power management, demand estimation and curtailment, periodic reports, outage planning, restoration, congestion management, inter-user boundary safety, event reporting and cyber security.

Part E (p74–75) is the Scheduling and Despatch Code; the Commission approved the SLDC’s draft code on 11 November 2019 and it is incorporated by reference. Part F (p75–78) is the Communication Code, covering communication boundaries, testing and audit, fault reporting, availability, performance monitoring, cyber security and procedures. Part G (p78–80) is the Protection Code, covering protection obligations, the Protection Manual and review of protection practices. Part H (p80) is the Metering Code, approved on 5 December 2019 and incorporated by reference. Part I (p81–86) covers data sharing, load-flow studies, dispute referral, compliance monitoring, the list of procedures to be issued, and the Commission’s powers to amend, remove difficulties, relax and issue directions.

The annexures (p86–119) provide technical specifications for CT/PT metering, the Site Responsibility Schedule format, the declared-capacity demonstration procedure and forms, the part-load and start-stop compensation mechanism, RSD and misdeclaration report formats, the reactive energy accounting and settlement mechanism, and merit order despatch stack formats.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Technical standards, Scheduling and despatch

Read with this

The regulation

Amendments and corrections

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document