Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MERC’s draft Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020, made under the Electricity Act 2003 to consolidate technical and commercial rules for the intra-state transmission system (InSTS) in Maharashtra. It is dated 1 March 2020 and signed by the Secretary; the text says it will come into force on publication in the Official Gazette, but no Gazette date is printed (p5, p7, p85). It would repeal and supersede the MEGC 2006, save for actions already taken, and refers to the CERC IEGC as a gap-filler and as prevailing on inconsistency (p7, p11).
Part A (p7–21) contains the short title, definitions, objective and scope. It applies to generators connected to InSTS, transmission licensees including the STU, SLDC, distribution licensees including deemed licensees and Indian Railways, open access consumers and EHV consumers connected to InSTS (p12–13). It reconstitutes the Grid Coordination Committee, sets out its review role and creates functional committees—MTC, OCC, PCC and MCCC—while allocating roles to STU, SLDC, transmission licensees, distribution licensees, Users, generators and QCAs (p13–21). Existing licensees and Users get a transition period for listed compliance items (p13).
Part B (p21–33) is the Planning Code. It covers generation resource adequacy and integrated resource planning, InSTS planning, planning criteria for EHV substations, wind/solar and HVDC, planning data and spinning reserve planning, and arrangements for monitoring implementation of the transmission plan.
Part C (p33–42) is the Connection Code. It specifies connection and safety standards, the application and approval process, connection agreements, grid parameter variations, equipment and fault-clearance requirements, protection, data and communication facilities, system recording instruments, and Site Responsibility Schedules.
Part D (p42–74) is the Operating Code. It covers operating procedures and system security, generator operation including governor and AVR requirements, treatment of renewable generation, declaration of commercial operation for generation/transmission/communication assets, declared-capacity demonstration, merit order despatch, technical minimum compensation, zero scheduling and reserve shutdown, voltage and reactive power management, demand estimation and curtailment, periodic reports, outage planning, restoration, congestion management, inter-user boundary safety, event reporting and cyber security.
Part E (p74–75) is the Scheduling and Despatch Code; the Commission approved the SLDC’s draft code on 11 November 2019 and it is incorporated by reference. Part F (p75–78) is the Communication Code, covering communication boundaries, testing and audit, fault reporting, availability, performance monitoring, cyber security and procedures. Part G (p78–80) is the Protection Code, covering protection obligations, the Protection Manual and review of protection practices. Part H (p80) is the Metering Code, approved on 5 December 2019 and incorporated by reference. Part I (p81–86) covers data sharing, load-flow studies, dispute referral, compliance monitoring, the list of procedures to be issued, and the Commission’s powers to amend, remove difficulties, relax and issue directions.
The annexures (p86–119) provide technical specifications for CT/PT metering, the Site Responsibility Schedule format, the declared-capacity demonstration procedure and forms, the part-load and start-stop compensation mechanism, RSD and misdeclaration report formats, the reactive energy accounting and settlement mechanism, and merit order despatch stack formats.
Read with this
The regulation
- Date not statedState Grid Code Regulations, 2020
Amendments and corrections
- Dated 21 Sep 2026State Grid Code, 2020 — First Amendment Regulations, 2026
Commencement notices and reasons
- Dated 2 Sep 2020State Grid Code Regulations, 2020 — Statement of Reasons
- Dated 25 Sep 2020Operationalisation of Merit Order Stack and Technical Minimum at 55% under State Grid Code Regulations, 2020 — Notification
- Dated 9 Mar 2022Reactive Energy Accounting Framework for Intra-State Hydro Generating Stations under the State Grid Code Regulations, 2020 — Notification, 2022
- Dated 21 Sep 2026State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
Earlier drafts
- Released with the notice dated 2 Aug 2025State Grid Code (First Amendment) Regulations, 2025 — Draft
- Dated 2 Aug 2025Public notice: Public Notice — Comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
- Released with the notice dated 2 Aug 2025Explanatory memorandum: State Grid Code Regulations, 2020 — First Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 5 Sep 2025Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
- Released with the notice dated 1 Mar 2020Explanatory memorandum: Draft State Grid Code Regulations, 2020 — Explanatory Memorandum
- Dated 1 Mar 2020Public notice: Draft State Grid Code Regulations, 2020 — Public Consultation Notice
- Dated 23 Mar 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Extension of Time for Submitting Comments
- Dated 16 Apr 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Comment Deadline Extension Notice, 16 April 2020
3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.