MERC · Maharashtra Electricity Regulatory Commission
Public Notice — Comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
Inviting comments, suggestions and / or objections on Draft Regulations
Public notice on a draftDated 2 Aug 2025Advertisement No. 12/2025 dated 2nd August 2025
Draft
The draft has since been finalised as the State Grid Code, 2020 — First Amendment Regulations, 2026.
Public notice on the State Grid Code (First Amendment) Regulations, 2025 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page public notice issued by the Maharashtra Electricity Regulatory Commission (MERC) under Advertisement No. 12/2025, dated 2 August 2025, opening a public consultation on two draft instruments: the Draft MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2025 and the Draft MERC (State Grid Code) (First Amendment) Regulations, 2025 (p1).
The notice does not reproduce either draft. It states that both drafts, each with its Explanatory Memorandum, are available in downloadable form on the Commission's website (p1).
The operative content is procedural. Stakeholders may submit comments, suggestions or objections within 21 days through the 'E-Public Consultation' tab on the MERC website; anyone who uploads there need not file a hard copy (p1). Persons without electronic access may file hard copy with the Secretary, MERC, at the World Trade Centre address, before 5 PM on 23 August 2025; submissions through any other mode will not be considered (p1). Only material received on or before that date will be considered before the drafts are finalised, and all further communication will be through the MERC website (p1). Contact details for help with the portal are given, along with the Secretary's signature (p1).
Read with this
The regulation
- Date not statedState Grid Code Regulations, 2020
Amendments and corrections
- Dated 21 Sep 2026State Grid Code, 2020 — First Amendment Regulations, 2026
Commencement notices and reasons
- Dated 2 Sep 2020State Grid Code Regulations, 2020 — Statement of Reasons
- Dated 25 Sep 2020Operationalisation of Merit Order Stack and Technical Minimum at 55% under State Grid Code Regulations, 2020 — Notification
- Dated 9 Mar 2022Reactive Energy Accounting Framework for Intra-State Hydro Generating Stations under the State Grid Code Regulations, 2020 — Notification, 2022
- Dated 21 Sep 2026State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
Earlier drafts
- Released with the notice dated 1 Mar 2020Maharashtra State Grid Code Regulations, 2020 — Draft
- Released with the notice dated 1 Mar 2020Explanatory memorandum: Draft State Grid Code Regulations, 2020 — Explanatory Memorandum
- Dated 1 Mar 2020Public notice: Draft State Grid Code Regulations, 2020 — Public Consultation Notice
- Dated 23 Mar 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Extension of Time for Submitting Comments
- Dated 16 Apr 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Comment Deadline Extension Notice, 16 April 2020
- Released with the notice dated 2 Aug 2025State Grid Code (First Amendment) Regulations, 2025 — Draft
- Released with the notice dated 2 Aug 2025Explanatory memorandum: State Grid Code Regulations, 2020 — First Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 5 Sep 2025Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.