Skip to content

MERC · Maharashtra Electricity Regulatory Commission

State Grid Code Regulations, 2020 — First Amendment, 2025 — Explanatory Memorandum — Draft

EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (STATE GRID CODE) (FIRST AMENDMENT) REGULATIONS, 2025

Explanatory memorandum to a draftReleased with the notice dated 2 Aug 2025

Draft

The draft has since been finalised as the State Grid Code, 2020 — First Amendment Regulations, 2026.

Explanatory memorandum to the State Grid Code (First Amendment) Regulations, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Maharashtra Electricity Regulatory Commission has issued an explanatory memorandum for a proposed first amendment to its State Grid Code Regulations, 2020. The document is a consultation paper: it explains the regulatory developments that make amendment necessary, reproduces the draft amended clauses, and asks the Grid Co-ordination Committee and stakeholders to comment before the Commission finalises the amendment (p1–4). It is not itself the notified amendment and states no commencement date.

Section 1 sets out the trigger: the State Grid Code must be consistent with the CERC Indian Electricity Grid Code, 2023, whose day-ahead and intra-day scheduling provisions differ from MEGC 2020; CERC has since amended its part-load compensation and tariff norms, and the Ministry of Power's Late Payment Surcharge Rules require un-requisitioned surplus power to be offered in the day-ahead market (p2–3). The Commission records CEA advice that State Grid Codes be aligned urgently and CEA's interim principles for URS scheduling until alignment (p3, p16–17). It also explains that the GCC, which reviews the Grid Code, has not submitted proposals, and asks MSLDC to convene it (p3–4). A separate ancillary services and reserves framework is flagged, with a possible trial period (p4).

Section 2 lists new definitions proposed to be imported from IEGC 2023, covering ancillary services, gate closure, GNA, minimum turn-down level, SCED and SCUC (p5). Section 3 deals with part-load compensation. It summarises CEA's flexible-operation regulation, the CERC IEGC and tariff amendments, and the NLDC compensation procedure approved by CERC; it then reproduces a revised Regulation 34 setting technical minimum and compensation for thermal stations, with separate treatment for Section 63 and Section 62 generators, start/stop and secondary fuel oil norms, annual reconciliation and emission reporting (p5–12). It also proposes to widen Annexure-4 applicability to specified State entities selling through short-term open access (p12–13).

Section 4 aligns the Scheduling and Despatch Code's applicability with the draft MERC DSM Regulations 2025, including bagasse/biomass, captive generators and RE generators other than wind and solar (p13–14). Section 5 is the LPS Rules implementation: it recounts the DSM Working Group's concerns, CEA's advice, and then reproduces amendments to Regulations 52 and 53. The day-ahead timetable is replaced with a detailed D-1 sequence ending with final despatch schedules, intended to let URS be declared before the DAM window (p17–21); the intra-day/RTM provisions are revised so schedule changes take effect from the 7th or 8th time block (p21–23).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Generation tariff

Read with this

The regulation

Amendments and corrections

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document