MERC · Maharashtra Electricity Regulatory Commission
State Grid Code Regulations, 2020 — First Amendment, 2025 — Explanatory Memorandum — Draft
EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (STATE GRID CODE) (FIRST AMENDMENT) REGULATIONS, 2025
Explanatory memorandum to a draftReleased with the notice dated 2 Aug 2025
Draft
The draft has since been finalised as the State Grid Code, 2020 — First Amendment Regulations, 2026.
Explanatory memorandum to the State Grid Code (First Amendment) Regulations, 2025 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Maharashtra Electricity Regulatory Commission has issued an explanatory memorandum for a proposed first amendment to its State Grid Code Regulations, 2020. The document is a consultation paper: it explains the regulatory developments that make amendment necessary, reproduces the draft amended clauses, and asks the Grid Co-ordination Committee and stakeholders to comment before the Commission finalises the amendment (p1–4). It is not itself the notified amendment and states no commencement date.
Section 1 sets out the trigger: the State Grid Code must be consistent with the CERC Indian Electricity Grid Code, 2023, whose day-ahead and intra-day scheduling provisions differ from MEGC 2020; CERC has since amended its part-load compensation and tariff norms, and the Ministry of Power's Late Payment Surcharge Rules require un-requisitioned surplus power to be offered in the day-ahead market (p2–3). The Commission records CEA advice that State Grid Codes be aligned urgently and CEA's interim principles for URS scheduling until alignment (p3, p16–17). It also explains that the GCC, which reviews the Grid Code, has not submitted proposals, and asks MSLDC to convene it (p3–4). A separate ancillary services and reserves framework is flagged, with a possible trial period (p4).
Section 2 lists new definitions proposed to be imported from IEGC 2023, covering ancillary services, gate closure, GNA, minimum turn-down level, SCED and SCUC (p5). Section 3 deals with part-load compensation. It summarises CEA's flexible-operation regulation, the CERC IEGC and tariff amendments, and the NLDC compensation procedure approved by CERC; it then reproduces a revised Regulation 34 setting technical minimum and compensation for thermal stations, with separate treatment for Section 63 and Section 62 generators, start/stop and secondary fuel oil norms, annual reconciliation and emission reporting (p5–12). It also proposes to widen Annexure-4 applicability to specified State entities selling through short-term open access (p12–13).
Section 4 aligns the Scheduling and Despatch Code's applicability with the draft MERC DSM Regulations 2025, including bagasse/biomass, captive generators and RE generators other than wind and solar (p13–14). Section 5 is the LPS Rules implementation: it recounts the DSM Working Group's concerns, CEA's advice, and then reproduces amendments to Regulations 52 and 53. The day-ahead timetable is replaced with a detailed D-1 sequence ending with final despatch schedules, intended to let URS be declared before the DAM window (p17–21); the intra-day/RTM provisions are revised so schedule changes take effect from the 7th or 8th time block (p21–23).
Read with this
The regulation
- Date not statedState Grid Code Regulations, 2020
Amendments and corrections
- Dated 21 Sep 2026State Grid Code, 2020 — First Amendment Regulations, 2026
Commencement notices and reasons
- Dated 2 Sep 2020State Grid Code Regulations, 2020 — Statement of Reasons
- Dated 25 Sep 2020Operationalisation of Merit Order Stack and Technical Minimum at 55% under State Grid Code Regulations, 2020 — Notification
- Dated 9 Mar 2022Reactive Energy Accounting Framework for Intra-State Hydro Generating Stations under the State Grid Code Regulations, 2020 — Notification, 2022
- Dated 21 Sep 2026State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
Earlier drafts
- Released with the notice dated 1 Mar 2020Maharashtra State Grid Code Regulations, 2020 — Draft
- Released with the notice dated 1 Mar 2020Explanatory memorandum: Draft State Grid Code Regulations, 2020 — Explanatory Memorandum
- Dated 1 Mar 2020Public notice: Draft State Grid Code Regulations, 2020 — Public Consultation Notice
- Dated 23 Mar 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Extension of Time for Submitting Comments
- Dated 16 Apr 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Comment Deadline Extension Notice, 16 April 2020
- Released with the notice dated 2 Aug 2025State Grid Code (First Amendment) Regulations, 2025 — Draft
- Dated 2 Aug 2025Public notice: Public Notice — Comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
- Dated 5 Sep 2025Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.