MERC · Maharashtra Electricity Regulatory Commission
Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Second Amendment, 2026 — Draft
Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) (Second Amendment) Regulations, 2026
Draft amendmentReleased with the explanatory memorandum dated 22 Sep 2026No. MERC/Tech/____/2026 dated ____September, 2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are draft MERC Second Amendment Regulations, 2026, proposing changes to the 2018 Forecasting, Scheduling and Deviation Settlement Regulations for solar and wind generation. The preamble says the aim is to strengthen forecasting and scheduling as renewable penetration grows, to support the Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, and to follow CERC's phased move towards schedule-based deviation assessment through a falling parameter "X" (p1). The draft is dated September 2026 and would commence on Gazette publication; a separate Implementation Date, not later than 1 April 2028, triggers the commercial switch (p1–2).
Regulation 2 substitutes or adds core definitions: a Deviation-WS Seller (DWS) formula, Contract Rate including a fallback for generators without PPAs to the State marginal generator's variable cost, and new terms for Energy Storage System, Existing WS Seller, Implementation Date, Renewable Energy Generating Station, Volume Limit, Wind-Solar Hybrid Generator and WS Seller (p2–3). Regulation 3 widens applicability to specified solar agriculture-pump projects on the intra-State transmission system and to distribution-connected renewable generating stations, with the latter's deviation treatment left for Commission specification after Grid Coordination Committee recommendations; new projects meeting bid or COD cut-offs move to the General Seller DSM Regulations, while Existing WS Sellers stay under these Regulations (p3–4).
Regulation 4 substitutes Regulation 7. From the Implementation Date, intra-State sale or self-consumption by Existing WS Sellers is settled on Scheduled Generation. The new Regulation 7 provides the DWS formula, a period-wise schedule reducing X to zero by 2031, Volume Limits and incremental over-injection and under-injection charge bands as percentages of Contract Rate, QCA settlement with SLDC and de-pooling, auxiliary-consumption charges, and transitional preservation of accounts settled before the Implementation Date; Regulation 7.2A and the earlier 7.2B continue only until that date (p4–6).
Regulation 5 requires SLDC to run parallel trial accounts for at least three complete monthly cycles and submit a readiness report before the commercial switch (p6–7). Regulation 6 restates metering duties, weekly meter data submission, and deadlines and minimum contents for a revised Detailed Procedure (p7). Regulation 7 restates QCA de-pooling, makes Scheduled Generation the default allocation method, allows a 51% alternative approved by installed capacity, and requires statements, records and monthly credit notes (p7–8).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 20 Jul 2018Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Statement of Reasons
- Dated 18 Mar 2019Notification of Effective Date for Commercial Arrangement under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 3 Jul 2024Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
- Dated 7 Dec 2018Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation Procedure, 2018
- Dated 18 Mar 2019Removal of Difficulty in implementation of Procedure under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 19 Dec 2019Amended F&S Procedure for Solar and Wind Generation
- Dated 19 Apr 2021Removal of Difficulty in Applicability of State Periphery Charges under the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Order, 2021
Earlier drafts
- Released with the notice dated 27 Feb 2018Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Draft
- Dated 27 Feb 2018Public notice: Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Public Notice Inviting Comments
- Released with the notice dated 27 Feb 2018File: Draft Solar and Wind Forecasting, Scheduling and Deviation Settlement Framework for Maharashtra, 2018 — Approach Paper
- Dated 21 Dec 2023Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — First Amendment, 2023 — Draft
- Released with the draft dated 21 Dec 2023Explanatory memorandum: Explanatory Memorandum on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
- Dated 22 Dec 2023Public notice: Public Notice on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.