MERC · Maharashtra Electricity Regulatory Commission

Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Second Amendment, 2026 — Draft

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) (Second Amendment) Regulations, 2026

Draft amendmentReleased with the explanatory memorandum dated 22 Sep 2026No. MERC/Tech/____/2026 dated ____September, 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are draft MERC Second Amendment Regulations, 2026, proposing changes to the 2018 Forecasting, Scheduling and Deviation Settlement Regulations for solar and wind generation. The preamble says the aim is to strengthen forecasting and scheduling as renewable penetration grows, to support the Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, and to follow CERC's phased move towards schedule-based deviation assessment through a falling parameter "X" (p1). The draft is dated September 2026 and would commence on Gazette publication; a separate Implementation Date, not later than 1 April 2028, triggers the commercial switch (p1–2).

Regulation 2 substitutes or adds core definitions: a Deviation-WS Seller (DWS) formula, Contract Rate including a fallback for generators without PPAs to the State marginal generator's variable cost, and new terms for Energy Storage System, Existing WS Seller, Implementation Date, Renewable Energy Generating Station, Volume Limit, Wind-Solar Hybrid Generator and WS Seller (p2–3). Regulation 3 widens applicability to specified solar agriculture-pump projects on the intra-State transmission system and to distribution-connected renewable generating stations, with the latter's deviation treatment left for Commission specification after Grid Coordination Committee recommendations; new projects meeting bid or COD cut-offs move to the General Seller DSM Regulations, while Existing WS Sellers stay under these Regulations (p3–4).

Regulation 4 substitutes Regulation 7. From the Implementation Date, intra-State sale or self-consumption by Existing WS Sellers is settled on Scheduled Generation. The new Regulation 7 provides the DWS formula, a period-wise schedule reducing X to zero by 2031, Volume Limits and incremental over-injection and under-injection charge bands as percentages of Contract Rate, QCA settlement with SLDC and de-pooling, auxiliary-consumption charges, and transitional preservation of accounts settled before the Implementation Date; Regulation 7.2A and the earlier 7.2B continue only until that date (p4–6).

Regulation 5 requires SLDC to run parallel trial accounts for at least three complete monthly cycles and submit a readiness report before the commercial switch (p6–7). Regulation 6 restates metering duties, weekly meter data submission, and deadlines and minimum contents for a revised Detailed Procedure (p7). Regulation 7 restates QCA de-pooling, makes Scheduled Generation the default allocation method, allows a 51% alternative approved by installed capacity, and requires statements, records and monthly credit notes (p7–8).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.