HPERC · Himachal Pradesh Electricity Regulatory Commission
Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Third Amendment, 2016 — Draft
Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (Third Amendment) Regulations, 2016
Draft amendmentDated 11 Aug 2016No. HPERC/438 dated 11th August, 2016
Draft
A proposal that has since been finalised; the final regulation is not yet published on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Himachal Pradesh Electricity Regulatory Commission's notification No. HPERC/438, issued at Shimla on 11 August 2016, which publishes for public comment the draft Third Amendment Regulations to the Commission's 2010 Renewable Power Purchase Obligation (RPO) and its Compliance Regulations (p1–2). It is a draft, not yet in force: objections or suggestions are invited within twenty one days of the notification and are to go to the Secretary, HPERC, Shimla; the draft text is also posted on the Commission's website (p2).
The recitals explain the need for the change. They restate the applicability rule in Regulation 3 of the Principal Regulations — distribution licensees, persons consuming electricity procured from conventional sources through open access third-party sale, and owners of conventional captive generating plants above 5 MVA taking power only for standby/emergency needs or above 1 MVA taking power for normal requirements (p1). They then cite para 6.4(1) and 6.4(1)(i) of the revised Tariff Policy of 28 January 2016, including the solar purchase obligation reaching 8% of total consumption excluding Hydro Power by March 2022, and the Ministry of Power order of 22 July 2016 fixing a uniform long-term RPO trajectory for 2016-17 to 2018-19 (p1–2).
The operative part is short. Draft Regulation 1 gives the short title and commencement from the date of publication in the Rajpatra, Himachal Pradesh (p2). Draft Regulation 2 substitutes a wholly new Regulation 4 on the quantum of the Renewable Power Purchase Obligation (p3–4). The new Regulation 4 requires the distribution licensee, and Captive and Open Access users/consumers, to buy a minimum percentage of their total consumption — including transmission and distribution losses — from renewable sources each year, with the percentages set out in a table split between Non-Solar, Solar and Total for the three years (p3–4). Provisos confine the solar obligation to solar generation only; exclude power bought at pooled cost under the CERC REC Regulations, 2010 from the obligation while including own renewable generation, purchases from renewable generating stations and renewable-derived purchases from other licensees; and preserve existing renewable PPAs until their present validity even if they exceed the prescribed percentage (p3–4). A sub-regulation lets the Commission revise the annual targets, suo motu or on a licensee's request, where supply constraints or factors beyond the licensee's control apply (p4).
Read with this
The regulation
Amendments and corrections
- Dated 3 Oct 2011Renewable Power Purchase Obligation and its Compliance (First Amendment) Regulations, 2011
- Dated 30 Mar 2016Renewable Power Purchase Obligation and its Compliance (Second Amendment) Regulations, 2016
- Dated 6 Dec 2017Renewable Power Purchase Obligation and its Compliance (Fourth Amendment) Regulations, 2017
- Dated 5 Feb 2020Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Sixth Amendment, 2020
- Dated 15 Jul 2021Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Seventh Amendment, 2021
Commencement notices and reasons
- Dated 19 Jun 2010Notification of Designated State Agency — RPO Regulations, 2010
- Dated 30 Sep 2010RPPO Applicability to Captive and Open Access Consumers, 2010 — Notification
- Dated 3 Oct 2011Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — First Amendment, 2011 — Statement of Objects/Reasons
- Dated 30 Nov 2016Short/Medium Term PPA for SHPs under REC Mechanism, Himachal Pradesh
- Dated 27 Sep 2017Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Fourth Amendment, 2017 — Statement of Reasons
- Dated 27 Nov 2018Renewable Power Purchase Obligation and its Compliance (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 5 Feb 2020Renewable Power Purchase Obligation and its Compliance (Sixth Amendment) Regulations, 2020 — Statement of Reasons
- Dated 15 Jul 2021Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Seventh Amendment, 2021 — finalisation order
Procedures and orders made under it
- Dated 23 Oct 2010Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project Order, 2010
- Dated 14 Aug 2015Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project Order, 2015
- Dated 8 Mar 2016Fixation of Fees and Charges for Accreditation of Renewable Energy Generation Project and Distribution Licensee Order, 2016
- Dated 30 Nov 2016RPO Compliance Formats for Captive Consumers
- Dated 17 Jul 2017Adjustment of Surplus/Shortfall of Renewable Energy Certificates or Renewable Energy w.r.t. RPO of FY 2016-17 in FY 2017-18 Order, 2017
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 27 Sep 2017Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Fourth Amendment, 2017 — Draft
- Dated 23 Nov 2019Renewable Power Purchase Obligation and its Compliance (Sixth Amendment) Regulations, 2019 — Draft
- Dated 3 Jun 2021Renewable Power Purchase Obligation and its Compliance (Seventh Amendment) Regulations, 2021 — Draft
3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.