Renewable Power Purchase Obligation and its Compliance Regulations, 2010 — Third Amendment, 2016 — Draft

Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (Third Amendment) Regulations, 2016

Draft amendmentDated 11 Aug 2016No. HPERC/438 dated 11th August, 2016

Draft

A proposal that has since been finalised; the final regulation is not yet published on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Himachal Pradesh Electricity Regulatory Commission's notification No. HPERC/438, issued at Shimla on 11 August 2016, which publishes for public comment the draft Third Amendment Regulations to the Commission's 2010 Renewable Power Purchase Obligation (RPO) and its Compliance Regulations (p1–2). It is a draft, not yet in force: objections or suggestions are invited within twenty one days of the notification and are to go to the Secretary, HPERC, Shimla; the draft text is also posted on the Commission's website (p2).

The recitals explain the need for the change. They restate the applicability rule in Regulation 3 of the Principal Regulations — distribution licensees, persons consuming electricity procured from conventional sources through open access third-party sale, and owners of conventional captive generating plants above 5 MVA taking power only for standby/emergency needs or above 1 MVA taking power for normal requirements (p1). They then cite para 6.4(1) and 6.4(1)(i) of the revised Tariff Policy of 28 January 2016, including the solar purchase obligation reaching 8% of total consumption excluding Hydro Power by March 2022, and the Ministry of Power order of 22 July 2016 fixing a uniform long-term RPO trajectory for 2016-17 to 2018-19 (p1–2).

The operative part is short. Draft Regulation 1 gives the short title and commencement from the date of publication in the Rajpatra, Himachal Pradesh (p2). Draft Regulation 2 substitutes a wholly new Regulation 4 on the quantum of the Renewable Power Purchase Obligation (p3–4). The new Regulation 4 requires the distribution licensee, and Captive and Open Access users/consumers, to buy a minimum percentage of their total consumption — including transmission and distribution losses — from renewable sources each year, with the percentages set out in a table split between Non-Solar, Solar and Total for the three years (p3–4). Provisos confine the solar obligation to solar generation only; exclude power bought at pooled cost under the CERC REC Regulations, 2010 from the obligation while including own renewable generation, purchases from renewable generating stations and renewable-derived purchases from other licensees; and preserve existing renewable PPAs until their present validity even if they exceed the prescribed percentage (p3–4). A sub-regulation lets the Commission revise the annual targets, suo motu or on a licensee's request, where supply constraints or factors beyond the licensee's control apply (p4).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Proposed changes (drafts with no final yet)

3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document