Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Short/Medium Term PPA for SHPs under REC Mechanism, Himachal Pradesh

'SHORT/MEDIUM TERM' POWER PURCHASE AGREEMENT FOR SHPs (UNDER REC MECHANISM)

AgreementDated 30 Nov 2016

Replaced by Renewable Power Purchase Obligation and its Compliance Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Read with the Renewable Power Purchase Obligation and its Compliance Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software, from pages 1 to 30 of 51. Check the regulator's original before you rely on it.

This is a blank model short/medium-term power purchase agreement for small hydro projects under the REC mechanism in Himachal Pradesh, designed for a generating company that has signed an Implementation Agreement with the Government of Himachal Pradesh and sells to HPSEBL (p1–2). The recitals tie it to CERC's REC Regulations notified on 14 January 2010 and to HPERC's RPO Regulations, 2010, which adopt the CERC framework and set renewable purchase obligation percentages for FY 2011-12 to FY 2021-22 (p1). They also record free power to the State Government, the Implementation Agreement, and the need for a separate agreement covering generation, evacuation, maintenance, free power and metering (p1–2).

Article 2 (pp3–10) is the definitional backbone: energy and capacity measures, billing, COD, synchronisation, interconnection and metering, outage classes, default events, REC/RPO terms, pooled cost/APPC, Government Supply and deemed-generation definitions. Article 3 (pp11–12) covers construction obligations, half-yearly progress reports, a six-month deadline for a separate interconnection facilities agreement, and a Construction Committee. Article 4 (pp13–14) sets synchronisation notice and inspection, commissioning tests by an Independent Engineer, commercial operation, and consequences of failure to achieve COD within 180 days of the last unit's first synchronisation.

Article 5 (pp15–17) governs operation and maintenance, scheduled, maintenance and forced outages, Control Centre dispatch, the Operating Committee and recordkeeping. Article 6 (pp18–19) is the commercial core: after first synchronisation the Company delivers Government Supply free and sells Net Saleable Energy to HPSEBL, with payment capped at pooled cost of purchase and deemed generation for specified grid, evacuation and backing-down events, subject to exclusions and preconditions. Article 7 (pp20–23) specifies Main and Check Meter standards, testing, error correction, joint readings and monthly reconciliation. Article 8 (pp24–26) specifies billing, payment timelines, a letter of credit, rebate, late payment penalty, supplementary bills, billing disputes, TOD/frequency adjustment and set-off. Article 9 (pp27–28) lists company and HPSEBL undertakings, insurance and performance guarantee. Article 10 (pp29–30) begins term, extension, default and termination.

Standard name
RPO Regulations
Primary topics
Power procurement and PPAs, Tariff determination, Billing and payment

Read with this

Proposed changes (drafts with no final yet)

3 more documents belong here and are not on Voltaic: 1 amendment, 1 commencement notice or statement of reasons and 1 procedure or order made under it.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document